Permit Information
Permit NumberESC10-00010
StatusFinaled
Name CURTIS BENNETT
Site Address 3565 E BARBER DR
Project NameDALLAS HARRIS ESTATES SUB #1
Customer Number 
ePlanReview 
Description
Construction & Development: No structures allowed under this permit.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/23/201112/23/201112/23/2011 DONE
DetailsClint A Smith
This area of the harris Ranch master project has been stabilized with hard scape, structures and vegitation.
DOC - Permit Finaled12/23/201112/23/201112/23/2011PPASS
DetailsClint A Smith
General Inspection11/30/201111/30/201111/30/2011 PASS
DetailsClint A Smith
General Inspection11/15/201111/15/201111/15/2011 PART
DetailsClint A Smith
Area is developed. Waiting on vertical construction on a small portion of lots.
General Inspection10/28/201110/28/201110/31/2011 PASS
DetailsClint A Smith
General Inspection10/13/201110/13/201110/13/2011 PASS
DetailsClint A Smith
General Inspection9/28/20119/28/20119/28/2011 PASS
DetailsClint A Smith
General Inspection9/13/20119/13/20119/13/2011 PASS
DetailsClint A Smith
General Inspection8/29/20118/29/20118/29/2011 PASS
DetailsClint A Smith
General Inspection8/12/20118/12/20118/12/2011 PASS
DetailsClint A Smith
General Inspection7/28/20117/28/20117/28/2011 PASS
DetailsClint A Smith
General Inspection7/13/20117/13/20117/13/2011 PASS
DetailsClint A Smith
General Inspection6/28/20116/28/20116/28/2011 PASS
DetailsClint A Smith
General Inspection6/13/20116/13/20116/13/2011 PART
DetailsClint A Smith
General Inspection5/27/20115/27/20115/27/2011 PASS
DetailsClint A Smith
General Inspection5/12/20115/12/20115/12/2011 PASS
DetailsClint A Smith
General Inspection4/27/20114/27/20114/27/2011 FAIL
DetailsClint A Smith
Verbal to RP: Cleanup all tracking within the alley way behind the homes off of Timbersaw. Will re-inspect on 4/28/2011AM.
General Inspection4/7/20114/7/20114/7/2011 PART
DetailsClint A Smith
General Inspection3/23/20113/23/20113/23/2011 PART
DetailsClint A Smith
The stabilized construction enntrance must be extended to the asphalt once work occurs again.
BMP Violation3/7/20113/8/20113/8/2011PPASS
DetailsClint A Smith
Conference3/7/20113/7/20113/7/2011PDONE
DetailsSteven Webb
Met with Knife River RP C. Bennett and inspector 460. Discussions took place on how to reduce track out, it was agreed to provide access controls and extend the rock entrance as needed where all traffic exiting the project will have to use the rock entrance, (Wise way south of ParkCenter). Inspector 460 will verify the controls are in place.
Tracking Control3/4/20113/7/20113/7/2011AFAIL
DetailsClint A Smith
Correction Notice
Verbal message to RP:
1. Provide access control on the construction exit that is located off of Wise Way.
2. Clean up all tracking in the culdisac off of Warmsprings rd.
Failure to comply will result in further enforcement. Will re-inspect on 2/8/2011PM.
Tracking Control3/4/20113/4/20113/4/2011AFAIL
DetailsClint A Smith
Verbal to RP:
Install access control on the access off of Wise Way on the south side of Warmsprings Rd where there is a stabilized construction exit but vechiles are going to the side to access through the project area. Also clean up al sediment off of the hard surfaces within the court on the south side of Warmsprongs Rd. Will re-inspect on 3/7/2011AM.
General Inspection2/24/20112/24/20112/24/2011 PASS
DetailsClint A Smith
General Inspection2/8/20112/9/20112/9/2011APASS
DetailsClint A Smith
General Inspection2/8/20112/8/20112/8/2011 FAIL
DetailsClint A Smith
Verbal 24hr Correction Notice to RP Listed:
Update RP information within a 24hr period or further enforcement will occur. Will re-inspect on 2/9/2011am.
General Inspection1/21/20111/21/20111/21/2011 PASS
DetailsClint A Smith
No activity in the past 30 days.
General Inspection1/6/20111/6/20111/6/2011 PART
DetailsClint A Smith
NO activity due to weather conditions. Once thaw occurs, will discuss with RP over the perventitive measures that need to occur.
General Inspection12/22/201012/22/201012/22/2010 PASS
DetailsClint A Smith
General Inspection ESC12/1/201012/1/201012/1/2010 PASS
DetailsClint A Smith
No activity.
BMP Violation11/15/201011/16/201011/16/2010APART
DetailsClint A Smith
After discussing with Knife River we have come to the agreement that they will miniumize tracking off of the project area without installing a stabilized staging area. The area would conflict with there grading operations that is occuring at the moment.
BMP Violation11/10/201011/15/201011/15/2010PCANC
DetailsClint A Smith
Tracking Control11/10/201011/10/201011/10/2010AFAIL
DetailsClint A Smith
Notice given to Dave Powell w/ Dallas Harris:
1. Provide a stabilized staging area where, maintianing, staging and fueling can occur on equipment with a stabilized access to minuimize tracking to the maximium extent practible on the north east end of Warm Springs Ave project area.
Clean up all tracking that is involve with the project area.
**Failure to comply with the given time frame will result in a stop work order.** Will re-inspect on 11/15/2010PM.
Tracking Control11/1/201011/5/201011/5/2010APASS
DetailsClint A Smith
Tracking Control10/29/201011/1/201011/1/2010AFAIL
DetailsClint A Smith
Verbal To Curtis Bennet:
Install a stabilized construction exit on the south side of warmsprings rd. Will re-inspect on 11/5/2010 AM.
Tracking Control10/28/201010/29/201010/29/2010ACANC
DetailsClint A Smith
General Inspection10/18/201010/18/201010/18/2010APASS
DetailsClint A Smith
General Inspection ESC10/8/201010/8/201010/8/2010 PART
DetailsSteven Webb
Verbal to RP, RP needs to verfiy that all denuded soil have been sprayed and then this permit may be transferred to the new another operator, D. Powell which represents Harris Ranch.
Conference9/21/20109/23/20109/23/2010ADONE
DetailsClint A Smith
Refeer to inspector 420
Conference9/21/20109/23/20109/23/2010ADONE
DetailsSteven Webb
10am: Discussion on compliance to both the Federal CGP and local ESC requirements regarding stabilization and closing out requirements of permit coverage. To summarize, at a minimum, manufactures application rate of soil binder along with perimeter controls (where needed) are expected for compliance. As well, continue to inspect for failure after binders are sprayed. Also discussions on moving from the development phases to vertical construction phase. Expectations for compliance both permit coverage and ESC stormwater and non-stormwater was covered. Developer to continue to visually monitor site discharges during inspections. Met with Knife River, (Jeff) Harris Ranch Engineer, (Dave P.), Knife Rivers repr, (Phil J.) and Boise City ESC inspector (Clint S.).
General Inspection9/21/20109/21/20109/21/2010PDONE
DetailsClint A Smith
Set up a meeting with Knife RIver and the representative for Dallas Harris for 10am on 9/23/2010.
General Inspection9/10/20109/13/20109/13/2010APART
DetailsClint A Smith
General Inspection ESC9/10/20109/10/20109/10/2010 CANC
DetailsClint A Smith
General Inspection ESC8/26/20108/26/20108/26/2010 PASS
DetailsClint A Smith
General Inspection ESC8/11/20108/11/20108/11/2010 PASS
DetailsClint A Smith
General Inspection ESC7/26/20107/26/20107/27/2010 PART
DetailsClint A Smith
Project is ulitilizing there storm water ponds that all of the storm drain system feeds into as there Passive Treatment System. Ponds at the time are self contained and do not enter the Water of the US due to a plug at the inlet of the poutlet pipe.
General Inspection ESC7/27/20107/27/20107/27/2010 CANC
DetailsSteven Webb
Duplicate
General Inspection ESC7/9/20107/9/20107/9/2010 PART
DetailsClint A Smith
Need to stay up on sweeping up at all accesses of the project area from the subbase to the paved streets.
General Inspection6/16/20106/24/20106/24/2010ADONE
DetailsClint A Smith
They have removed the construction exit due to the phase of the road base for the road construction.
Tracking Control6/21/20106/21/20106/21/2010PPART
DetailsSteven Webb
Verbal correction to K. Baty, RP, Top dressing of rock has been installed on the ParkCenter entrance but rock entrance south of Barber is in need of rock.
General Inspection6/16/20106/16/20106/16/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Maintain dust by using the given dust control measures illistrated with the approved ESC plan.
General Inspection ESC6/16/20106/16/20106/16/2010 PART
DetailsSteven Webb
Verbal to RP: Construction entrances (2) needs to be maintained including correct types of material and the one off of Barber needs widened. Discussed final stabilization. Around ponds topsoil is in place and other misc. areas topsoil is being placed. Power service to site is needed to run irrigation, this issue is being worked. As soon as power is in place then seeding can be done and watering will cause growth. Old sediment barriers are expected to be removed if no longer needed.
Complaint Inspection6/1/20106/1/20106/1/2010PPART
DetailsSteven Webb
DEQ M. Van K. water and stockpile soils needs to be sampled, water under method 8260 and soils TPH. Do not proceed with work in this area until the sample results indicate under standards.
General Inspection ESC5/28/20105/28/20105/28/2010 PASS
DetailsClint A Smith
BMP Violation4/22/20104/26/20104/26/2010APASS
DetailsClint A Smith
BMP Violation4/22/20104/22/20104/22/2010PFAIL
DetailsClint A Smith
Correction Notice:
1. Add additional material or High visability construction fence with T-post an both end of the new Barber Rd.
2. Install the rolled erosion control blanket within the storm water channel in the whole channel per the manufactures specifications. Also provide the city with the specifiactions to verify.
3. Provide the proper info regarding the RP on the ESC sign.
* Failure to comply will result in a stop work order. Will re-inspect on 4/26/10AM.
Tracking Control4/15/20104/19/20104/19/2010APART
DetailsClint A Smith
Verbal to RP:
Once the tie ends are complete at the north end of project, If they area going to be accessing that area a stabilized construction exit is required.
Tracking Control4/15/20104/15/20104/15/2010PFAIL
DetailsClint A Smith
Correction Notice:
1. Install a stabilized construction exit per industry standards at both access points on the new Barber Rd. Or Block off using T-post and high visability construction fence.
2. Maintain both construction exits onto Warm Springs Rd.
** Failure to comply will result in further enforcement. Will re-inspect on 4/19/10AM.
General Inspection4/7/20104/13/20104/13/2010APART
DetailsClint A Smith
They will be using a seed, tach, mulch application on the slopes of the channel. Also requiring an approved blanket over the top of the application to hold the seed on the banks.
Tracking Control4/7/20104/7/20104/7/2010PFAIL
DetailsClint A Smith
Verbal to RP:
No later than 4/13/10 we must see that at the north end of project area either block off access and or install a stabilized construction exit. Keep up with sweeping. Also told RP to figure out how they will be stabilizing the channel that connects the three ponds. We also cannot have a active water flow in the channel until the time of achieving final stabilization with in the whole channel. Will follow up on 4/13/10AM.
General Inspection3/23/20103/23/20103/23/2010APART
DetailsClint A Smith
Verbal to RP:
Clean up tracking at the north east end of project. A stabilized access will be installed by next week after utilites are installed.
Site Preparation3/19/20103/19/20103/19/2010PPASS
DetailsClint A Smith
Dewatering from the third pond has been completed as of 3/18/10.
General Inspection3/17/20103/17/20103/17/2010PPART
DetailsClint A Smith
Walk area with Gary w/ Knife River and spoke to the RP over the concerns of water level in both exsisting ponds. Told them to keep an eye on the levels. Alos told RP to utilize access controls along the Barber Rd. area where they have removed the road to pervent tracking off onto Warmsprings rd.
General Inspection3/11/20103/12/20103/12/2010APART
DetailsClint A Smith
All water is beiing container on the Harris Ranch land. Left a Message for the RP over access control on and offo f the site where tracking has occured. Will re-inspect on 3/15/10AM
General Inspection3/11/20103/11/20103/11/2010PDONE
DetailsClint A Smith
Refer to #420 note. Will be inspecting on a daily basis until the dewatering is complete.
BMP Violation3/10/20103/11/20103/11/2010PPART
DetailsSteven Webb
Inspect de-watering activities: Inspected the site for compliance, problems relating to de-watering is being worked by Knife River (Gary T. ###-####). Work is being performed to divert water east of Wellings Creek. At site inspection the water is retained into the Cattle Field. Ditch running through the field has direct discharge into the Boise River, but no water has reached the river. Reviewed the holding are south of the fence at the ditch and recommended to Gary T. to install checks and rock berm to allow for possible flows to be retained. Boise City will be inspecting on a daily basis until de-watering is completed. Verbal to Knife River to install a satisfactory rock construction exit at Warm Springs Ave. Inspector 460 will re-inspect on 3/12.
Complaint Inspection3/10/20103/10/20103/10/2010PPART
DetailsSteven Webb
Received call from ACHD, Inspector 460 visited site and provide a report to ESC Inspector 420. Called applicant, consultent and Eng. Reminder all parties of the conditions of the permit. Discharges not to exceed pre-development flows into Wallings Creek. Informed parties to manage de-watering according to local and Federal regulations. Inspection will occur on Thursday 3-11 afternoon and if problems persist then a stop work on de-watering will be issued.
General Inspection2/25/20103/3/20103/3/2010ACANC
DetailsClint A Smith
Random Inspection2/25/20102/25/20102/25/2010PPASS
DetailsClint A Smith
Work is only occuring on the south side of Warmsprings road. Are activily dewatering from multiple location on the project into the 2nd sediment basin. No issues found on or off site at this time. Will re-inspect on 3/3/10am.
Site Preparation2/22/20102/22/20102/22/2010ADONE
DetailsClint A Smith
No activity.
General Inspection2/2/20102/9/20102/9/2010APART
DetailsClint A Smith
Verbal to RP:
Need to flare out the rock to cover the are coming into the project area to the south east of access.
General Inspection2/4/20102/4/20102/4/2010PPART
DetailsSteven Webb
Verbal to RP, Randy, need to maintain construction entrance. Complete within two working days. No other activity observed.
General Inspection1/26/20102/2/20102/2/2010APART
DetailsClint A Smith
Verbal to RP:
Prior to th start of activity, need to maintain construction exit an add additional exit where needed to miniumize thack out. Will follow up in the near future.
Site Preparation1/22/20101/26/20101/26/2010APASS
DetailsClint A Smith
Dewatering at the North west end of project into the pond. NO issues present.
Site Preparation1/22/20101/22/20101/22/2010 PART
DetailsClint A Smith
Starting to mobilize equiptment. But due to the weather no activity is occuring. Will re-inspect on 1/26/10 am.
Conference1/15/20101/15/20101/15/2010PDONE
DetailsSteven Webb
1:30 Pre-Construction Meeting: Met with Harris Ranch Rep, D. Powell, Contractor, Jeff & Randy and 3rd party consultant, P. Jones. Reviewed ESC including permit conditions, stabilization requirements, dewatering (only pre-development flow rates are allowed into Walling Creek) and water must meet water quality standards, transfering permits to another party and the upcoming Jan. 29th ESC workshop.
Conference1/15/20101/15/20101/15/2010PDONE
DetailsClint A Smith
refer to #420 notes.
Issue & PRINT permit COM  1/15/2010 DONE
Permit Ready to Issue  1/13/2010 DONE
Telephone call  1/13/2010 DONE
called Randy permit ready and fee given 1-13-10 dld
Routing - Erosion and Sediment1/8/2010 1/12/2010 PASS
DetailsSteven Webb
Routing - Erosion and Sediment1/11/2010 1/12/2010 PASS
DetailsSteven Webb
ESC plan approved along with the permit conditions.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2010  
Application received  1/8/2010