Permit Information
Permit NumberESC10-00013
StatusFinaled
Name THOMAS CALLSEN
Site Address 775 E PARKCENTER
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/3/20111/3/20111/3/2011 DONE
DetailsClint A Smith
Permit finalled
DOC - Permit Finaled1/3/20111/3/20111/3/2011PPASS
DetailsClint A Smith
General Inspection ESC12/3/201012/3/201012/3/2010 PASS
DetailsClint A Smith
General Inspection ESC11/2/201011/2/201011/2/2010 PASS
DetailsSteven Webb
Site is temporary stable, not ready to final because final stabilization has not been achieved.
General Inspection ESC10/1/201010/1/201010/1/2010 PASS
DetailsClint A Smith
Have initiated stabilization of all disturded areas..
Random Inspection8/31/20108/31/20108/31/2010PPASS
DetailsBill VanDegrift
looks ok
Random Inspection8/26/20108/26/20108/26/2010PPASS
DetailsJim Storey
Random Inspection8/20/20108/20/20108/20/2010PPASS
DetailsJim Storey
General Inspection ESC8/6/20108/6/20108/6/2010 PASS
DetailsClint A Smith
Random Inspection7/6/20107/6/20107/6/2010APASS
DetailsJim Storey
Random Inspection7/1/20107/1/20107/1/2010PPASS
DetailsJim Storey
Random Inspection6/15/20106/15/20106/15/2010APASS
DetailsJim Storey
General Inspection6/7/20106/11/20106/11/2010APART
DetailsClint A Smith
Verbal message to RP:
Clean up sediment onto the the new Barber Rd.
Random Inspection6/8/20106/8/20106/8/2010APASS
DetailsJim Storey
General Inspection ESC6/7/20106/7/20106/7/2010 PART
DetailsClint A Smith
Verbal to RP:
MAintain washout pit and make sure it is lined with plastic prior to next pour date. Also maintain all storm drain inlet protection. Will re-inspect on 6/11/10
Random Inspection5/5/20105/5/20105/5/2010PPART
DetailsClint A Smith
Verbal to RP:
Must line concrete washout with a minium of a 10 mil plastic. Deliniate the stabilized construction exit to the north west of project area. Will re-inspect in the near future.
General Inspection4/21/20104/21/20104/21/2010PPASS
DetailsBob Reichert
General Inspection4/16/20104/16/20104/16/2010PPASS
DetailsBob Reichert
Random Inspection4/15/20104/15/20104/15/2010APASS
DetailsBill VanDegrift
Random Inspection4/13/20104/13/20104/13/2010PPASS
DetailsJim Storey
Random Inspection4/9/20104/9/20104/9/2010APASS
DetailsJim Storey
Random Inspection4/7/20104/7/20104/7/2010APASS
DetailsBill VanDegrift
looks good
General Inspection4/5/20104/5/20104/5/2010PPASS
DetailsBob Reichert
Random Inspection4/2/20104/2/20104/2/2010PPASS
DetailsJim Storey
General Inspection3/19/20103/19/20103/19/2010PPART
DetailsSteven Webb
Construction entrances being installed, (Parkcenter and Penn.) Sediment barriers installed along Penn and partial on Parkcenter. Informed RP (Tom) that washout pit will be needed prior to placement of concrete.
General Inspection3/10/20103/11/20103/11/2010AFAIL
DetailsClint A Smith
Correction Notice: (Given to RP)
1. Install a sediment barrier along the North East end of project area.
2. Install access controls to delineate access on and off of the project area.
3. Place ESC sign where it is visable from the street.
* Failure to comply will result in further enforcement. Will re-inspect on 2/12/10 PM
Site Preparation3/2/20103/8/20103/8/2010ANR
DetailsClint A Smith
Site Preparation3/2/20103/2/20103/2/2010 NR
DetailsClint A Smith
Will re-inspect on 3/8/10AM
Issue & PRINT permit COM  2/23/2010 DONE
Routing - Erosion and Sediment1/21/2010 1/21/2010 PASS
DetailsSteven Webb
ESC plan is approved with attached conditions.
Application received  1/11/2010