Site Final | 2/8/2010 | 2/12/2010 | 2/12/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 2/3/2010 | 2/8/2010 | 2/8/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 2/3/2010 | 2/3/2010 | 2/3/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Per the conditions of the permit issued a sediment is required to be installed between the demo work and the ponds. Will re-inspect on 4/8/10
|
Issue & PRINT permit COM | | | 1/27/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 1/12/2010 | | 1/12/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved with the attached permit conditions.
|
Application received | | | 1/11/2010 | | |
|
|
|
|