Site Final | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/14/2010 | 6/14/2010 | 6/14/2010 | P | PASS |
Mike Jordan
|
|
|
Final stabalization is now completed.
|
Site Final | 5/12/2010 | 5/12/2010 | 5/12/2010 | A | FAIL |
Mike Jordan
|
|
|
SIte has been cleaned and graded. Final stabalization has not been completed.
|
General Inspection | 3/17/2010 | 3/17/2010 | 3/17/2010 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 3/8/2010 | 3/9/2010 | 3/9/2010 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/17/2010 | 2/18/2010 | 2/18/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 2/17/2010 | 2/17/2010 | 2/17/2010 | A | FAIL |
Clint A Smith
|
|
|
MEssage to RP: 1. Clean up all hardsurface of all sediment and debris. 2. Remove all lumber off of the hard surfaces. 3. Maintain concrete washout pit. IT has exceeded the 50% compacity. Will Re-inspect on 2/18/10PM.
|
BMP Violation | 2/12/2010 | 2/12/2010 | 2/12/2010 | A | PASS |
Mike Jordan
|
|
|
Issues were resolved. Contractor on site cleaning hardsurfaces at time of inspection.
|
Random Inspection | 2/10/2010 | 2/10/2010 | 2/10/2010 | A | PART |
Mike Jordan
|
|
|
Notified RP via verbal c/n to sweep all hardsurfaces of silts.
|
BMP Violation | 1/26/2010 | 2/1/2010 | 2/1/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 1/28/2010 | 1/28/2010 | 1/28/2010 | | CANC |
Steven Webb
|
|
|
duplicate
|
Site Preparation | 1/28/2010 | 1/28/2010 | 1/28/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 | P | PART |
Bob Reichert
|
|
|
see 460 comments
|
Site Preparation | 1/26/2010 | 1/26/2010 | 1/26/2010 | P | PART |
Clint A Smith
|
|
|
Verbal to RP: Remove all concrete washout residual at the end of street where pump truck washed out last week. Will re-inspect on 2/1/10.
|
BMP Violation | 1/22/2010 | 1/26/2010 | 1/26/2010 | P | CANC |
Steven Webb
|
|
|
Already taken care of by Inspector M. Jordan
|
BMP Violation | 1/25/2010 | 1/25/2010 | 1/25/2010 | P | PASS |
Mike Jordan
|
|
|
ESC permit sign has been posted. Conc washout provided. Silts have been swept from hard surfaces. ok for conc.
|
Tracking Control | 1/22/2010 | 1/25/2010 | 1/25/2010 | A | CANC |
Clint A Smith
|
|
|
Being completed by inspector #450.
|
BMP Violation | 1/25/2010 | 1/25/2010 | 1/25/2010 | A | FAIL |
Mike Jordan
|
|
|
Contacted RP and gave verbal c/n that previous issues on last c/n have not yet been resolved. Noted to RP that no further work would be allowed on jobsite until all issues have been corrected.
|
Site Preparation | 1/22/2010 | 1/22/2010 | 1/22/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: 1. Clean up all sediment tracked onto the hard surface by the end of the day. Will re-inspect on 1/25/09AM.
2. Clean up all concrete washout at the end of the street and provide a washout (prior to next pour date) by 1/26/10 am. Will re-inspect on 1/26/10 PM. Failure to comply with any of these two violation will result in a Stop Work Order.
|
Issue & PRINT permit SFD | | | 1/21/2010 | | DONE |
|
|
|
|
Application received | | | 1/12/2010 | | |
|
|
|
|