Site Final | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 10/29/2010 | 10/29/2010 | 10/29/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 8/16/2010 | 8/16/2010 | 8/16/2010 | P | PASS |
Daryl Spivey
|
|
|
|
Random Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 | P | PASS |
Daryl Spivey
|
|
|
|
General Inspection | 6/16/2010 | 6/16/2010 | 6/16/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/11/2010 | 6/11/2010 | 6/11/2010 | A | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 5/24/2010 | 5/25/2010 | 5/25/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 5/24/2010 | 5/24/2010 | 5/24/2010 | A | FAIL |
Clint A Smith
|
|
|
Spoke with excavator to set up the construction access prior to trucks pulling up into the lot due to the saturated soil. Will have it completed this morning and all sediment cleaned up off of the hard surfaces also.
|
Site Preparation | 5/21/2010 | 5/21/2010 | 5/21/2010 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 5/14/2010 | | DONE |
|
|
|
|
General Inspection | 4/16/2010 | 4/16/2010 | 4/16/2010 | P | PASS |
Bob Reichert
|
|
|
no work done, only temp pole
|
Routing - Erosion and Sediment | 2/4/2010 | | 2/4/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved along with the attached permit conditions.
|
Application received | | | 1/29/2010 | | |
|
|
|
|