Site Final | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/18/2010 | 11/18/2010 | 11/18/2010 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 10/21/2010 | 10/22/2010 | 10/22/2010 | A | PASS |
Dixie Fellows
|
|
|
john is the contact..site clean..laying sod
|
General Inspection | 8/3/2010 | 8/3/2010 | 8/3/2010 | P | PASS |
Dixie Fellows
|
|
|
jonathan
|
Site Preparation | 5/4/2010 | 5/4/2010 | 5/5/2010 | P | PASS |
Tony Young
|
|
|
|
General Inspection | 4/23/2010 | 4/26/2010 | 4/26/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/22/2010 | 4/23/2010 | 4/23/2010 | A | PASS |
Clint A Smith
|
|
|
Verbal to RP: Install a sediment barrier at the back of driveway inffront of the soil pliles at the end of the day and or prior to a storm event. Will re-inspect on 4/26/10am.
|
Conference | 4/22/2010 | 4/22/2010 | 4/22/2010 | A | DONE |
Steven Webb
|
|
|
Soils was transported off site to 3510 Hill Road and a stop work was placed under mis10-00098. Excavator contacted SGW and this additional area of disturbance was added to this permit. Compliance is expected. Will inspect for compliance on 2/23/10.
|
Site Preparation | 3/23/2010 | 3/23/2010 | 3/23/2010 | | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 3/16/2010 | | DONE |
|
|
|
|
Application received | | | 2/3/2010 | | |
|
|
|
|