Site Final | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | PASS |
Troy James
|
|
|
|
BMP Violation | 4/5/2010 | 4/6/2010 | 4/6/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/5/2010 | 4/5/2010 | 4/5/2010 | P | PART |
Steven Webb
|
|
|
Correction to RP; Sheetrock piled at street and other solid waste not containerized. Sheetrock crews had arrived while SGW was discussing with the RP. They were loading up debris.
|
BMP Violation | 4/5/2010 | 4/5/2010 | 4/5/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Containerize and oir remove all trash debris off of the frontand side area of project lot. Also Post ESC sign where visable from the street. Will re-inspect on 4/6/10AM.
|
Random Inspection | 4/1/2010 | 4/1/2010 | 4/1/2010 | P | PART |
Dave Hannah
|
|
|
contractor has cleaned up road
|
General Inspection | 3/30/2010 | 3/30/2010 | 3/30/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
Tracking Control | 3/16/2010 | 3/18/2010 | 3/18/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/17/2010 | 3/17/2010 | 3/17/2010 | | CANC |
Clint A Smith
|
|
|
moved until 3/18/10
|
Complaint Inspection | 3/16/2010 | 3/16/2010 | 3/16/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: CLean up all hard surfaces of sediment and debris. RP also said he would have the sweep company sweep the whole project area. Will re-inspect on 3/18/10am
|
General Inspection | 3/15/2010 | 3/15/2010 | 3/16/2010 | P | CANC |
Clint A Smith
|
|
|
|
Random Inspection | 3/12/2010 | 3/12/2010 | 3/12/2010 | A | PASS |
Jim Storey
|
|
|
|
Random Inspection | 3/11/2010 | 3/11/2010 | 3/11/2010 | A | PASS |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 3/10/2010 | | DONE |
|
|
|
|
Application received | | | 2/10/2010 | | |
|
|
|
|