Permit Information
Permit NumberESC10-00159
StatusFinaled
Name STEVE BRUNEEL
Site Address 455 E CAVE CT
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/16/20109/17/20109/17/2010APASS
DetailsTony Young
DOC - Permit Finaled9/17/20109/17/20109/17/2010PPASS
DetailsTony Young
BMP Violation7/1/20107/6/20107/6/2010APASS
DetailsClint A Smith
BMP Violation7/1/20107/1/20107/1/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Clean all stucco residual off of the lot. Also provide a washout pit for ALL NON STORMWATER POLLUTANTS that are non VOC's products. Will follow up for completion on 7/6/10am
General Inspection6/8/20106/8/20106/8/2010APASS
DetailsTony Young
Random Inspection6/4/20106/4/20106/4/2010PPASS
DetailsTony Young
Random Inspection4/14/20104/14/20104/14/2010APART
DetailsSteven Webb
Minor tracking but overall site is ok considering the lot size and type of work being performed. Sweep daily or as needed.
Site Preparation4/6/20104/6/20104/6/2010APASS
DetailsTony Young
Site Preparation4/5/20104/5/20104/6/2010PPASS
DetailsTony Young
Site Preparation3/23/20103/23/20103/23/2010PPASS
DetailsTony Young
BMP Violation3/19/20103/23/20103/23/2010APASS
DetailsClint A Smith
Site Preparation3/19/20103/19/20103/19/2010 FAIL
DetailsClint A Smith
Message to RP:
Need to install a sediemnt barrier along the front perimeter of lot. Install storm drain inlet protection at the storm drain located at the bottom of court. Also Post the ESC sign visable from the street.
Will re-inspect on 3/23/10AM.
Issue & PRINT permit SFD  3/12/2010 DONE
Routing - Erosion and Sediment3/11/2010 3/11/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the permit's attached conditions.
Routing - Erosion and Sediment3/5/2010 3/5/2010 FAIL
DetailsSteven Webb
Boise City received the ESC blueprint plan but the narrative re-submittal was not included. Plan checklist sent to the PD via e-mail which provides directives on what is required. Two copies of the narrative is required.
Routing - Erosion and Sediment3/2/2010 3/2/2010 FAIL
DetailsSteven Webb
ESC plan does not meet requirement per BMC 8-17. Plan checklist e-mailed to applicant, Harris Construction.
Application received  2/25/2010