Site Final | 9/21/2010 | 9/22/2010 | 9/22/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 7/30/2010 | 7/30/2010 | 7/30/2010 | P | FAIL |
Tom Arcoraci
|
|
|
must complete last correction notice
|
Site Final | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must remove all bmp's and stabilize all disturbed soil.
|
Site Preparation ESC | 5/7/2010 | 5/7/2010 | 5/7/2010 | | PASS |
Clint A Smith
|
|
|
No need to protect storm drain since they installing a new seepage bed.
|
Issue & PRINT permit COM | | | 4/30/2010 | | DONE |
Tisha Gallop
|
|
|
|
Routing - Erosion and Sediment | 3/12/2010 | | 3/12/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the attached conditions.
|
Application received | | | 3/1/2010 | | |
|
|
|
|