Site Final | 6/2/2010 | 6/3/2010 | 6/3/2010 | A | PASS |
Tony Young
|
|
|
|
DOC - Permit Finaled | 6/3/2010 | 6/3/2010 | 6/3/2010 | P | PASS |
Tony Young
|
|
|
|
Random Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Dixie Fellows
|
|
|
phil..site clean
|
BMP Violation | 4/27/2010 | 4/27/2010 | 4/28/2010 | P | PART |
Tony Young
|
|
|
will clean up this week end,, Phil said they always clean the whole subdivision on fridays
|
Random Inspection | 4/26/2010 | 4/27/2010 | 4/27/2010 | A | FAIL |
Tony Young
|
|
|
need to clean trash up
|
Tracking Control | 4/23/2010 | 4/26/2010 | 4/26/2010 | A | PART |
Dixie Fellows
|
|
|
check site for garbage...cleaned all sites except one that will be cleaned this week
|
General Inspection | 4/23/2010 | 4/23/2010 | 4/23/2010 | A | FAIL |
Dixie Fellows
|
|
|
phil is the contact..talked to phil about garbage and he said it would be cleaned up tonight..i will rescheck mon am
|
BMP Violation | 3/25/2010 | 3/26/2010 | 3/26/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/25/2010 | 3/25/2010 | 3/25/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Remove or install a sediemnt barrier where the stockpile of base rock is on the sidewalk and gutter pan. Make sure to install a sediment barrier along the downward slope of the gutterpan to minumize turbid runoff if not removed or relocated onto the lot. Will re-inspec t on 3/26/10AM.
|
Site Preparation | 3/23/2010 | 3/23/2010 | 3/23/2010 | P | PASS |
Tony Young
|
|
|
|
Site Preparation | 3/22/2010 | 3/22/2010 | 3/22/2010 | A | PART |
Tony Young
|
|
|
work in progress
|
Site Preparation | 3/18/2010 | 3/19/2010 | 3/19/2010 | A | NR |
Tony Young
|
|
|
|
Issue & PRINT permit SFD | | | 3/18/2010 | | DONE |
|
|
|
|
Application received | | | 3/2/2010 | | DONE |
|
|
|
|