Site Final | 7/19/2010 | 7/19/2010 | 7/19/2010 | P | PASS |
Tony Young
|
|
|
slope is grown back 80%
|
BMP Violation | 3/25/2010 | 3/26/2010 | 3/26/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/25/2010 | 3/25/2010 | 3/26/2010 | P | FAIL |
Tony Young
|
|
|
need BMPs in place
|
General Inspection | 3/25/2010 | 3/25/2010 | 3/25/2010 | P | FAIL |
Bob Reichert
|
|
|
see 460 comments
|
Site Preparation | 3/18/2010 | 3/25/2010 | 3/25/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to pool company (Ryan): Install storm drain inlet protection at the 2 storm drains at the ned of the driveway. Use any type of city/ACHD approved inlet protection. Will re-inspect on 3/26/10PM.
|
Site Preparation | 3/18/2010 | 3/18/2010 | 3/18/2010 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 3/11/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 3/10/2010 | | 3/10/2010 | | PASS |
Steven Webb
|
|
|
ESC plan approved according to the attached conditions.
|
Application received | | | 3/9/2010 | | |
|
|
|
|