Site Final | 4/26/2011 | 4/26/2011 | 4/26/2011 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 4/26/2011 | 4/26/2011 | 4/26/2011 | P | PASS |
Dave Hannah
|
|
|
|
Aging Inspection | 4/21/2011 | 4/21/2011 | 4/26/2011 | | PASS |
Dave Hannah
|
|
|
|
Site Final | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | NR |
Dave Hannah
|
|
|
crew still working on landscaping
|
Random Inspection | 5/13/2010 | 5/13/2010 | 5/13/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 5/11/2010 | 5/11/2010 | 5/11/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 5/6/2010 | 5/6/2010 | 5/6/2010 | P | PASS |
Troy James
|
|
|
|
BMP Violation | 4/20/2010 | 4/22/2010 | 4/22/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/21/2010 | 4/22/2010 | 4/22/2010 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 4/21/2010 | 4/21/2010 | 4/21/2010 | P | FAIL |
Steven Webb
|
|
|
Major mud track out from crane; contractor cleaned up most but informed rp and contractor that additional steps are needed to prevent this from occurring. Next time enforcement will proceed directly to a stop work order.
|
BMP Violation | 4/19/2010 | 4/20/2010 | 4/20/2010 | A | FAIL |
Clint A Smith
|
|
|
Correction Notice: (Verbal to RP w/ written Correction) 1. Provide a trash containner for all construction waste debris. 2. Remove all corete washout residual or place into the washout pit provided. 3. Provide a contained washout pit for all non VOC products. 4. Place ESC signs where visable from the street. ** Failure to comply will result in a stop work order. Will re-inspect on 4/22/10AM.
|
Site Preparation ESC | 4/8/2010 | 4/8/2010 | 4/8/2010 | | CANC |
Steven Webb
|
|
|
Passed by inspector 425 on 4/6/10
|
Random Inspection | 4/6/2010 | 4/6/2010 | 4/6/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 4/5/2010 | 4/5/2010 | 4/5/2010 | P | PART |
Jim Storey
|
|
|
need to clean roadway at end of the day
|
Issue & PRINT permit SFD | | | 4/1/2010 | | |
|
|
|
|
Application received | | | 3/12/2010 | | |
|
|
|
|