General Inspection ESC | 5/28/2010 | 5/28/2010 | 5/28/2010 | | DONE |
Clint A Smith
|
|
|
Work completed.
|
DOC - Permit Finaled | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 3/25/2010 | 3/30/2010 | 3/30/2010 | A | PASS |
Clint A Smith
|
|
|
Met with RP and walked the project area. Keeping spoil pile away from the green belt and the have a curb as a sediment barrier. Also using wattle in areas where there is a gap in the curbs. D.I.s have been protected. Will re-inspect on 4/1/10
|
Site Preparation | 3/25/2010 | 3/25/2010 | 3/25/2010 | | NR |
Clint A Smith
|
|
|
Not starting until 3/30/10. Will re-inspect on the date of 3/30/10.
|
Routing - Erosion and Sediment | 3/17/2010 | | 3/18/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC permit's attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/18/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 3/18/2010 | | DONE |
Barbara Stitt
|
|
|
|
Telephone call | | | 3/18/2010 | | DONE |
Barbara Stitt
|
|
|
Left voice message for Kerry Fulfer that permit is ready @ 10:55am on 3-18-10 BAS
|
Issue & PRINT permit COM | | | 3/18/2010 | | DONE |
|
|
|
|
Application received | | | 3/17/2010 | | |
|
|
|
|