Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC10-00271
StatusFinaled
Name JOHN SEIDL
Site Address 5190 E SAWMILL WAY
Project Name 
Customer Number 
ePlanReview 
Description
Per attached conditions
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final8/25/20108/31/20108/31/2010APASS
DetailsDave Hannah
DOC - Permit Finaled8/31/20108/31/20108/31/2010PPASS
DetailsDave Hannah
Site Final8/24/20108/24/20108/25/2010PNR
DetailsDave Hannah
still working on land scaping
Random Inspection6/21/20106/21/20106/21/2010PPASS
DetailsDave Hannah
Conference5/21/20105/25/20105/25/2010ADONE
DetailsSteven Webb
9am Presented a copy of the permit's conditions to RP, discussions regarding compliance reviewed. Compliance with the conditions are expected.
Conference5/21/20105/25/20105/25/2010ADONE
DetailsClint A Smith
Went over the conditions that pertain with the permit that was issued. Also discussed with them over federal requirements and local requirements.
BMP Violation5/17/20105/18/20105/18/2010PPASS
DetailsClint A Smith
General Inspection5/14/20105/17/20105/17/2010PFAIL
DetailsClint A Smith
Correction Notice:
Must provide a washout for all non-storm water pollutants.
Must clean up all concrete spoils and dispose of in a proper manor.
Failure to comply with notice will result in a stop work order. Will re-inspect on 5/18/10 PM.
Site Preparation5/14/20105/14/20105/14/2010PPART
DetailsSteven Webb
Verbal to RP, John: Sign is not posted, trash and construction debris not containerized, no washout. Complete all items by noon on Monday, re-inspection will take place by inspector 460 on Monday, May 17th after 12:00 noon.
Site Preparation4/23/20104/27/20104/27/2010APASS
DetailsClint A Smith
Site Preparation4/23/20104/23/20104/23/2010 NR
DetailsClint A Smith
Random Inspection4/21/20104/21/20104/21/2010PPART
DetailsDave Hannah
site is very muddy today there is track out every where hard to tell hows it is Talked with foundaion crew they will clean up there site befor they leave
Site Preparation4/20/20104/20/20104/20/2010PPASS
DetailsDave Hannah
Issue & PRINT permit SFD  4/16/2010 DONE
Application received  4/2/2010