Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00281
StatusVoid/No Violation
Name ROBERT GRUBB
Site Address 702 E BOISE AVE
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection2/18/20112/18/20112/18/2011 DONE
DetailsClint A Smith
No activity.
General Inspection1/3/20111/3/20111/4/2011 NR
DetailsSteven Webb
Random Inspection11/15/201011/16/201011/16/2010ANR
DetailsJim Storey
have not started project.
Site Preparation10/6/201010/20/201010/20/2010ANR
DetailsClint A Smith
Site Preparation9/22/201010/6/201010/6/2010ANR
DetailsClint A Smith
Site Preparation9/15/20109/22/20109/22/2010ANR
DetailsClint A Smith
Site Preparation9/2/20109/15/20109/15/2010ANR
DetailsClint A Smith
R. Grubb not the RP, new one listed? Verify status of project and of the RP situation. Refer to 9/2/10 history.
Conference9/2/20109/2/20109/2/2010PDONE
DetailsSteven Webb
Review site, respond to Spokane General Contractor: Talked to Al, GC and informed him that Rober Grubb is listed as the RP but Al infomed me that he is not, (Robert insertion into the ESC permit case's orgin is unknown) but his super from Spokane will be getting certified in Sept via IRP and then taking the certification class. Discussion on getting started with a sub-contractor being the RP in which I said that is fine as long as the day-to-day control is being complied with. Purposal for starting project is Mid-September. Also SGW provided the requirement of the practice of discharging turbid water off site or into the MS4 system is not acceptable. This area can have high ground water. Reviewed options for de-watering and it was stated that compliance is expected. Site preparation will be performed in Mid-September.
Site Preparation8/19/20108/19/20108/19/2010 NR
DetailsClint A Smith
Issue & PRINT permit COM  8/12/2010 DONE
Routing - Erosion and Sediment4/21/2010 4/21/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the narrative, plan page C1.2 and the attached permit conditions.
Application received  4/8/2010  
VOIDED CHANGE STATUS