Site Final | 7/23/2010 | 8/23/2010 | 8/23/2010 | A | DONE |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 8/11/2010 | 8/11/2010 | 8/11/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 7/23/2010 | 7/23/2010 | 7/23/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Final | 7/21/2010 | 7/22/2010 | 7/22/2010 | A | FAIL |
Clint A Smith
|
|
|
Need to stabilize all disturbed with a stabilized method.
|
Site Preparation | 6/10/2010 | 6/10/2010 | 6/10/2010 | | PASS |
Jim Storey
|
|
|
|
Site Preparation | 6/8/2010 | 6/8/2010 | 6/8/2010 | P | PART |
Jim Storey
|
|
|
provide wash out.
|
Issue & PRINT permit COM | | | 6/3/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 5/4/2010 | | 5/4/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and permit's conditions.
|
Routing - Erosion and Sediment | 4/23/2010 | | 4/23/2010 | | FAIL |
Clint A Smith
|
|
|
Must provide an ESC application for review.
|
Application received | | | 4/16/2010 | | |
|
|
|
|