Site Final | 8/5/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 8/9/2010 | 8/9/2010 | 8/9/2010 | P | PASS |
Dave Hannah
|
|
|
|
Site Final | 8/4/2010 | 8/4/2010 | 8/5/2010 | P | NR |
Dave Hannah
|
|
|
crew land scaping lot
|
Random Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 | A | PASS |
Dave Hannah
|
|
|
|
General Inspection | 6/16/2010 | 6/16/2010 | 6/16/2010 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 6/14/2010 | 6/16/2010 | 6/16/2010 | A | PASS |
Clint A Smith
|
|
|
reinspection
|
Random Inspection | 6/14/2010 | 6/14/2010 | 6/14/2010 | A | FAIL |
Bill VanDegrift
|
|
|
left message with rp to pick up trash
|
Conference | 5/21/2010 | 5/25/2010 | 5/25/2010 | A | DONE |
Steven Webb
|
|
|
9am. Conditions presented to RP, compliance to conditions are expected.
|
Conference | 5/21/2010 | 5/25/2010 | 5/25/2010 | A | DONE |
Clint A Smith
|
|
|
Went over the conditions that pertain with the permit that was issued. Also discussed with them over federal requirements and local requirements.
|
BMP Violation | 5/19/2010 | 5/20/2010 | 5/20/2010 | P | PART |
Clint A Smith
|
|
|
Still requiring a washout pit for all non storm water pollutants throuighout the duration of the project.
|
BMP Violation | 5/19/2010 | 5/19/2010 | 5/19/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: Provide a washout for all non stormwater pollutants. Clean up all concrete wash residual off of the lot area. Dispose of properly. Failure to comply will result in a stop work order. will re-inspect on 5/20/10PM.
|
General Inspection | 5/14/2010 | 5/17/2010 | 5/17/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/14/2010 | 5/14/2010 | 5/14/2010 | | PART |
Steven Webb
|
|
|
Sign not posted, , verbal to rp.
|
Random Inspection | 5/12/2010 | 5/12/2010 | 5/12/2010 | P | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit SFD | | | 5/7/2010 | | |
|
|
|
|
Application received | | | 4/21/2010 | | |
|
|
|
|