Permit Information
Permit NumberESC10-00352
StatusFinaled
Name KELLY KEHRER
Site Address 711 N CURTIS RD
Project Name 
Customer Number 
ePlanReview 
Description
DEMO--Changed responsible persons effective 11-9-10 to be Kelly Kehrer who has been contracted by Hawkins Companies to perform duties and inspections of RP///BAS
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection5/9/20115/9/20115/9/2011 PASS
DetailsTom Arcoraci
Site Final5/9/20115/9/20115/9/2011PPASS
DetailsTom Arcoraci
completed
General Inspection3/9/20113/9/20113/9/2011 PASS
DetailsSteven Webb
Conditions unchanged, site is inactive and stabilzation steps have been initialed. No problems observed.
General Inspection11/18/20101/7/20111/6/2011PPASS
DetailsSteven Webb
Site is temporary stable, frozen and no problems observed.
General Inspection10/28/201011/18/201011/18/2010PPASS
DetailsSteven Webb
Have ESC permit been transferred to Hawkins? Verify, if not call Aaron at Hawkins. ESC permit has been transferred, new certified RP attached to the permit. Grass has surfaced the ground surface. Should re-vegetate well in the spring time. Will follow up in 6 weeks.
(F) Reprint permit  11/9/2010 DONE
DetailsBarbara Stitt
General Inspection10/21/201010/29/201010/28/2010PFAIL
DetailsSteven Webb
Permit transferred?? Verify. Kristey came to City Hall to transfer the permit from Idea Demo to Hawkins but their were no certified RP for the transfer therefore the transfer could not be completed, intormed Kristey that a valid RP must be attached to any active ESC permit; transfer to be completed after a valid RP is able to be attached to the permit. Will nspect in three weeks not only the site but to see if the transfer has been done.
General Inspection10/19/201010/19/201010/19/2010PPART
DetailsSteven Webb
Contact Aaron Carrol: Overall site is ok, informed Hawkins Company that they need to have the ESC permit issued to Ideal Demo to them until the site has achieved final stabilization (70% growth). Monthly inspection and failures repaired (if observed) during the winter months. Aaron Carrol is the contact for Hawkins. Informed Bob Archibald that the BLD can be finalled and the bond released.
General Inspection10/19/201010/19/201010/19/2010PCANC
DetailsSteven Webb
Duplicate
Override - People Holds  10/19/2010  
Override - People Holds  10/19/2010  
Random Inspection10/6/201010/6/201010/6/2010PPASS
DetailsTom Arcoraci
Random Inspection10/6/201010/6/201010/6/2010PCANC
DetailsTom Arcoraci
Conference9/9/20109/10/20109/10/2010ADONE
DetailsSteven Webb
10:30 Review ESC plan and discuss final stabilzation measures. Met with general contractor and owner, (Hawkins). Upon completeion of demo of structures & hard surfaces the site will be final graded and then contractor will file NOT (transfered to other filer (Hawkins). At this point the bond may be released (BLD finaled). The ESC will remain open until the ground has been seeded and 70% growth has been established. Informed Hawkins that inspections will need to continue to take place until the site is ready to close, (70% growth). Access controls (concrete barricades) are expected at all access points to reduce any traffic and trackout.
General Inspection9/9/20109/9/20109/9/2010PPART
DetailsSteven Webb
Overall things are in compliance, prior to removing ashpalt on north side, sediment barriers are needed until the site is stablized. Will meet with owners on Friday, 9/10 to review final stabilzation measures.
Random Inspection8/5/20108/5/20108/5/2010PPASS
DetailsTom Arcoraci
Site Preparation7/12/20107/12/20107/12/2010PPART
DetailsClint A Smith
Verbal to RP:
Post ESC sign where visable from the street.
Site Preparation6/7/20106/11/20106/11/2010ANR
DetailsClint A Smith
Site Preparation6/1/20106/7/20106/7/2010ANR
DetailsClint A Smith
Site Preparation5/27/20106/1/20106/1/2010ACANC
DetailsClint A Smith
Work has not begun. Will be starting on 6/7/10. Will inspect on that date.
Site Preparation5/13/20105/27/20105/27/2010ACANC
DetailsClint A Smith
Site Preparation5/13/20105/13/20105/13/2010 NR
DetailsClint A Smith
Will re-inspec t in two weeks.
Issue & PRINT permit COM  5/6/2010 DONE
Random Inspection5/3/20105/3/20105/3/2010PFAIL
DetailsSteven Webb
Module building are being removed from their pads, misc. trash and debris, (insulation, wood, etc) are uncontained. Informed RP that this debris needs to be taken care of, including removal from site, containerized). With a high wind warning in affect for this evening and night this material has the possibility to being blown throughout the neighborhood. Norman, ###-####.
Routing - Erosion and Sediment5/3/2010 5/3/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and permit conditions.
Application received  4/28/2010  
Routing - Erosion and Sediment4/28/2010 4/28/2010 FAIL
DetailsSteven Webb
ESC plan does not meet the requirements of BMC 8-17 or the plan designer manual. E-mailed plan review checklist to the plan designer. RE-submittal will be needed.