Tracking Control | 12/27/2010 | 12/28/2010 | 12/28/2010 | A | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Clean up all tracking onto the street from the project lot. Will re-inspect 12/28/2010am
|
DOC - Permit Finaled | 12/27/2010 | 12/27/2010 | 12/27/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Final | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | FAIL |
Mike Jordan
|
|
|
Final stabalization not yet completed.
|
Random Inspection | 6/1/2010 | 6/1/2010 | 6/1/2010 | P | PASS |
Mike Jordan
|
|
|
|
General Inspection | 5/28/2010 | 5/28/2010 | 5/28/2010 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 5/20/2010 | 5/20/2010 | 5/20/2010 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 5/18/2010 | 5/19/2010 | 5/20/2010 | P | CANC |
Clint A Smith
|
|
|
|
General Inspection | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | CANC |
Clint A Smith
|
|
|
Wrong date.
|
Site Preparation | 5/18/2010 | 5/18/2010 | 5/18/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to loisted RP: Need to change the RP information on the ESC sign to proper RP that was given to the city. Will re-inspect on 05/19/10 PM.
|
Site Preparation | 5/17/2010 | 5/17/2010 | 5/17/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 5/14/2010 | 5/14/2010 | 5/14/2010 | P | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit SFD | | | 5/13/2010 | | DONE |
|
|
|
|
Application received | | | 4/28/2010 | | |
|
|
|
|