Permit Information
Permit NumberESC10-00364
StatusFinaled
Name CODY HALL
Site Address 2770 E WINDSONG DR
Project Name 
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/14/20117/14/20117/14/2011PPASS
DetailsDaryl Spivey
General Inspection7/14/20117/14/20117/14/2011 PASS
DetailsDaryl Spivey
General Inspection6/13/20116/13/20116/13/2011 PASS
DetailsDaryl Spivey
BMP Violation5/11/20115/12/20115/12/2011APASS
DetailsClint A Smith
BMP Violation5/9/20115/11/20115/11/2011APART
DetailsClint A Smith
Moved until 5/12/2011. The washout pit will be completed by that time.
General Inspection5/9/20115/9/20115/9/2011 FAIL
DetailsClint A Smith
Verbal to RP:
Provide a washout pit. Clean up all residual throout the front of the project area and place it into the washout pit. Clean up all hasd surfaces of all sediment and debris. Maintain the storm drain on the infront of the project area. WIll re-inspect on 05/11/2011AM.
General Inspection4/8/20114/8/20114/8/2011 PASS
DetailsDave Hannah
Random Inspection3/8/20113/8/20113/8/2011APASS
DetailsDaryl Spivey
Random Inspection2/16/20112/16/20112/16/2011APASS
DetailsTroy James
BMP Violation2/11/20112/15/20112/15/2011APASS
DetailsClint A Smith
General Inspection2/10/20112/11/20112/11/2011PPART
DetailsClint A Smith
Need to clean up the rest of the sediment build up on the sidewalk and clean up all gravelalong the south west gutterpan at the storm drain. Will re-inspect on 2/15/2011AM.
Complaint Inspection2/10/20112/10/20112/10/2011PFAIL
DetailsClint A Smith
Verbal to RP:
CLean up all sediment and debris off of all hard sufaces. Also pick up all trash debris scattered around the project area and place into the trash container. Will re-inspect on 2/11/2011PM.
Site Preparation2/8/20112/8/20112/8/2011PCANC
DetailsDaryl Spivey
Random Inspection2/8/20112/8/20112/8/2011PPASS
DetailsDaryl Spivey
site clean.........ds
BMP Violation1/7/20111/10/20111/10/2011APASS
DetailsClint A Smith
Complaint Inspection1/7/20111/7/20111/7/2011AFAIL
DetailsClint A Smith
Correction Notice: Verbal to RP
1. Clean up all hard surface of all sediment and debris.
2. Remove and replace the storm drain inlet protection on both side the street.
Failure to comply by 1/07/2011pm will result in a stop work order.
Will re-inspect on 1/10/2011am
BMP Violation12/27/201012/28/201012/28/2010PPART
DetailsClint A Smith
Verbal to RP and excavating company:
Clean up all foot tracking onto the hard surfaces by the end of the day.
General Inspection12/27/201012/27/201012/27/2010PFAIL
DetailsClint A Smith
Verbal to RP:
Maintain or replace sediment barrier at the front of the project area. Will re-inspect on 12/28/2010PM
General Inspection12/24/201012/24/201012/27/2010 FAIL
DetailsClint A Smith
BMP Violation11/17/201011/18/201011/18/2010ADONE
DetailsClint A Smith
Still working on stock pile removal. Will re-inspect on 11/19/2010.
BMP Violation11/17/201011/17/201011/17/2010PPART
DetailsClint A Smith
After discussing with RP over the silt fence being down due to the removal of the stockpile. Informed him it there is any slope left over 2% to re-install the siltfence. Will re-inspect on 11/18/2010AM.
BMP Violation10/19/201010/21/201010/21/2010APASS
DetailsClint A Smith
Random Inspection10/19/201010/19/201010/19/2010PPASS
DetailsDave Hannah
Random Inspection10/19/201010/19/201010/19/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Maintain silt fence on the front and back of project.
Replace the d.i. protection on both sside of the stereet at the front of project.
Remove all debris out of the rainage basin at the back of the project area. Will re-inspect on 10/21/2010AM.
Random Inspection10/16/201010/18/201010/18/2010APASS
DetailsDave Hannah
Random Inspection9/20/20109/20/20109/20/2010PPASS
DetailsDave Hannah
Site Preparation9/10/20109/10/20109/10/2010PPART
DetailsTony Young
work in progress on BMPs
Site Preparation6/16/20106/28/20106/28/2010ANR
DetailsClint A Smith
Site Preparation6/9/20106/16/20106/16/2010ANR
DetailsClint A Smith
Site Preparation6/9/20106/9/20106/9/2010 NR
DetailsClint A Smith
Issue & PRINT permit SFD  6/2/2010 DONE
Routing - Erosion and Sediment5/6/2010 5/6/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and the ESC permit's attached conditions.
Application received  4/30/2010