Site Final | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PASS |
Dave Hannah
|
|
|
|
General Inspection | 3/21/2011 | 3/21/2011 | 3/21/2011 | | PASS |
Dave Hannah
|
|
|
|
General Inspection | 2/1/2011 | 2/1/2011 | 2/1/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/17/2010 | 12/17/2010 | 12/17/2010 | A | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 11/5/2010 | 11/5/2010 | 11/5/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 9/30/2010 | 9/30/2010 | 9/30/2010 | | PART |
Clint A Smith
|
|
|
Make sure that hard surfaces are free of all sediment on a daily basis to miniumize dust concerns.
|
Issue & PRINT permit COM | | | 9/23/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/9/2010 | | 9/9/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and the ESC permit conditions.
|
Routing - Erosion and Sediment | 8/31/2010 | | 8/31/2010 | | FAIL |
Steven Webb
|
|
|
Submittals routed to Erosion Control did not contain an Erosion Control Plan, ECP. Informed applicant that this is needed prior to the project moving forward.
|
Routing - Erosion and Sediment | 6/1/2010 | | 6/1/2010 | | FAIL |
Steven Webb
|
|
|
Documents did not include a ESC plan which is required by BMC 8-17. Informed contractor via voice mail, Vertical Construction.
|
Application received | | | 5/13/2010 | | |
|
|
|
|