Site Final | 10/22/2010 | 10/22/2010 | 10/22/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 10/12/2010 | 10/12/2010 | 10/12/2010 | A | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 8/3/2010 | 8/3/2010 | 8/3/2010 | A | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 6/21/2010 | 6/21/2010 | 6/21/2010 | A | PASS |
Troy James
|
|
|
|
Site Preparation | 6/17/2010 | 6/17/2010 | 6/17/2010 | | CANC |
Steven Webb
|
|
|
inspector 460 passed on 6/16/10
|
General Inspection | 6/16/2010 | 6/16/2010 | 6/16/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/15/2010 | 6/15/2010 | 6/15/2010 | A | PASS |
Dave Hannah
|
|
|
|
Site Preparation | 6/10/2010 | 6/10/2010 | 6/10/2010 | P | PASS |
Dave Hannah
|
|
|
|
Issue & PRINT permit SFD | | | 6/10/2010 | | DONE |
|
|
|
|
Site Preparation | 5/27/2010 | 5/27/2010 | 5/27/2010 | | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 5/24/2010 | 5/24/2010 | 5/24/2010 | A | PASS |
Clint A Smith
|
|
|
|
Issue & PRINT permit SFD | | | 5/20/2010 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/17/2010 | | 5/17/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and the ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 5/17/2010 | | |
|
|
|
Alex
|
Application received | | | 5/14/2010 | | |
|
|
|
|