General Inspection | 5/5/2011 | 5/5/2011 | 5/5/2011 | | DONE |
Clint A Smith
|
|
|
Permit Finaled.
|
DOC - Permit Finaled | 5/5/2011 | 5/5/2011 | 5/5/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | | PASS |
Daryl Spivey
|
|
|
|
Complaint Inspection | 3/4/2011 | 3/4/2011 | 3/4/2011 | A | CANC |
Clint A Smith
|
|
|
Wrong permit.
|
General Inspection | 2/28/2011 | 2/28/2011 | 2/28/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/28/2011 | 1/28/2011 | 1/28/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | PASS |
Clint A Smith
|
|
|
no activity
|
BMP Violation | 6/3/2010 | 6/4/2010 | 6/4/2010 | A | PART |
Clint A Smith
|
|
|
Waiting on the RP to either install a sediment barrier on the down gradient slope of the driveway or to cover the stockpile with visquen.
|
Site Preparation | 6/3/2010 | 6/3/2010 | 6/3/2010 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Install a sediment barrier surrounding the area at the top of driveway where all the material is beibg staged, including the stockpiles. Will re-inspect on 6/4/10AM
|
Permit Ready to Issue | | | 5/27/2010 | | DONE |
Barbara Stitt
|
|
|
|
Issue & PRINT permit SFD | | | 5/27/2010 | | DONE |
|
|
|
|
Application received | | | 5/26/2010 | | |
|
|
|
|
Routing - Erosion and Sediment | 5/26/2010 | | 5/26/2010 | | PASS |
Clint A Smith
|
|
|
ESC plan waiver approved with attached conditions.
|