Site Final | 8/9/2010 | 8/10/2010 | 8/10/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 8/9/2010 | 8/9/2010 | 8/9/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/23/2010 | 6/24/2010 | 6/24/2010 | A | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 6/17/2010 | 6/17/2010 | 6/17/2010 | | PART |
Clint A Smith
|
|
|
Verbal to RP: Provide a non storm water washout. Also post the ESC sign at the front of the building where visable from the street.
|
Issue & PRINT permit COM | | | 6/10/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/8/2010 | | 6/8/2010 | | DONE |
Tim L. Woodard
|
|
|
Waiver letter approved. Applicant must comply with all attached conditions. TLW
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/8/2010 | | DONE |
Tim L. Woodard
|
|
|
|
Application received | | | 5/27/2010 | | |
|
|
|
|