General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | DONE |
Clint A Smith
|
|
|
Permit Finalled
|
DOC - Permit Finaled | 12/28/2010 | 12/28/2010 | 12/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 8/10/2010 | 8/12/2010 | 8/13/2010 | A | PASS |
Clint A Smith
|
|
|
|
Complaint Inspection | 8/10/2010 | 8/10/2010 | 8/10/2010 | P | FAIL |
Clint A Smith
|
|
|
Correction Notice: Install additional protection on the outlet on the East side of the outlet that is required by ACHD.
|
General Inspection | 8/4/2010 | 8/4/2010 | 8/4/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP. Must perovide scdiment barrier protection on both sides of the storm drain outlet to the BOise River.
|
Random Inspection | 7/28/2010 | 7/28/2010 | 7/28/2010 | A | PART |
Steven Webb
|
|
|
Misc areas are in need of controls, around waterway, discharge areas. Informed inspector 460 who was also inspecting the south side of the greed belt. Storms are building in the southwest so controls to be installed promptly.
|
BMP Violation | 7/14/2010 | 7/14/2010 | 7/14/2010 | A | PART |
Clint A Smith
|
|
|
Message to RP: Must post an ESC sign at each phase location. Must provide a site preparation prior to stat of any additional phases for BMP compliance.
|
BMP Violation | 6/18/2010 | 6/23/2010 | 6/23/2010 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 6/16/2010 | 6/18/2010 | 6/18/2010 | A | FAIL |
Clint A Smith
|
|
|
RP informed that they will have all bmp's installed correctly prior to the start of work on 6/23/10. Will re-inspect on 6/23/10 am.
|
Site Preparation | 6/16/2010 | 6/16/2010 | 6/16/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Prior to any excavting with phase 2, all straw wattle BMP's must be install per the Boise City Field Guide. Will re-inspect on 6/18/10 am.
|
Site Preparation | 6/14/2010 | 6/15/2010 | 6/15/2010 | P | CANC |
Clint A Smith
|
|
|
Wrong date
|
Site Preparation | 6/8/2010 | 6/14/2010 | 6/14/2010 | P | CANC |
Clint A Smith
|
|
|
re-scheduled for 6/15/10
|
Site Preparation | 6/8/2010 | 6/8/2010 | 6/8/2010 | | NR |
Steven Webb
|
|
|
Work not started, RP said work to start 6/14/10, site preparation inspection scheduled for then.
|
Routing - Erosion and Sediment | 5/28/2010 | | 6/1/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and permits conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/1/2010 | | |
|
|
|
|
Telephone call | | | 6/1/2010 | | DONE |
|
|
|
t/c w garret at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/1/2010 | | DONE |
|
|
|
|
Issue & PRINT permit COM | | | 6/1/2010 | | DONE |
|
|
|
|
Application received | | | 5/28/2010 | | |
|
|
|
|