Site Final | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Tony Young
|
|
|
|
BMP Violation | 7/8/2010 | 7/12/2010 | 7/12/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/8/2010 | 7/8/2010 | 7/8/2010 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide a non storm water pollutant washout pit. Post ESC sign at the front of the building visable from the market place. Will re-inspect on 7/12/10am
|
Override - People Holds | | | 7/1/2010 | | |
|
|
|
|
Issue & PRINT permit COM | | | 7/1/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 6/8/2010 | | 6/8/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC permit conditions.
|
Application received | | | 6/3/2010 | | |
|
|
|
|