General Inspection | 12/28/2010 | 12/28/2010 | 12/28/2010 | | DONE |
Clint A Smith
|
|
|
Permit finalled.
|
DOC - Permit Finaled | 12/28/2010 | 12/28/2010 | 12/28/2010 | P | PASS |
Clint A Smith
|
|
|
|
Random Inspection | 9/27/2010 | 9/27/2010 | 9/27/2010 | P | PASS |
Clint A Smith
|
|
|
Starting to place down 2" washed rock on pad where it was used for a staging area. Will be hydro seeding the section of the lot where the rock is not placed.
|
General Inspection | 9/8/2010 | 9/8/2010 | 9/9/2010 | P | DONE |
Clint A Smith
|
|
|
Contractor will be cleaning up lot next week.
|
BMP Violation | 6/23/2010 | 6/23/2010 | 6/23/2010 | A | PASS |
Steven Webb
|
|
|
Washout maintained and sign posted.
|
Site Preparation | 6/23/2010 | 6/23/2010 | 6/23/2010 | P | PASS |
Clint A Smith
|
|
|
All provisions inplace.
|
Conference | 6/23/2010 | 6/23/2010 | 6/23/2010 | A | FAIL |
Steven Webb
|
|
|
Met Tom D. and 3rd party consultant for the contractor, (MacMillian) on site. Washout is in need of maintanence and yellow stormwater sign was not posted.
|
Site Preparation | 6/14/2010 | 6/14/2010 | 6/14/2010 | | PASS |
Clint A Smith
|
|
|
|
Routing - Erosion and Sediment | 6/4/2010 | | 6/7/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/7/2010 | | |
|
|
|
|
Permit Ready to Issue | | | 6/7/2010 | | DONE |
|
|
|
|
Telephone call | | | 6/7/2010 | | |
|
|
|
Called and left a message for Jesse Geary that permit is ready and fees due on 6-7-10 @ 3:10pm BAS
|
Issue & PRINT permit COM | | | 6/7/2010 | | DONE |
|
|
|
|
Application received | | | 6/4/2010 | | |
|
|
|
|