Site Final | 8/30/2010 | 8/31/2010 | 9/1/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 8/30/2010 | 8/30/2010 | 8/30/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
BMP Violation | 7/21/2010 | 7/22/2010 | 7/22/2010 | A | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/21/2010 | 7/21/2010 | 7/21/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Correction Notice: 1. Clean all residual leaching from the debris container. 2. Protect the storm drain inlet. 3. Post ESC where it is visable from the street. Failure to comply within the given time frame will result in a stop work order. Will re-inspect for compliance on 7/22/2010AM.
|
Site Preparation | 7/21/2010 | 7/21/2010 | 7/21/2010 | | CANC |
Steven Webb
|
|
|
duplication
|
Issue & PRINT permit COM | | | 7/14/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/13/2010 | | 7/13/2010 | | DONE |
Carl D Madsen
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2010 | | |
|
|
|
|
Application received | | | 6/23/2010 | | |
|
|
|
|