General Inspection | 12/30/2010 | 12/30/2010 | 12/30/2010 | | DONE |
Clint A Smith
|
|
|
Permit Finalled
|
DOC - Permit Finaled | 12/30/2010 | 12/30/2010 | 12/30/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 7/1/2010 | 7/1/2010 | 7/1/2010 | | PASS |
Clint A Smith
|
|
|
Waiting on a site final
|
General Inspection | 6/24/2010 | 6/25/2010 | 6/25/2010 | A | FAIL |
Clint A Smith
|
|
|
All bmp's must bee removed and all disturbed soil must be stabiklized with an approved stabilization method.Notified the RP of the situation and how to a achieve a pass on a site final.
|
General Inspection | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | CANC |
Clint A Smith
|
|
|
|
General Inspection | 6/24/2010 | 6/24/2010 | 6/24/2010 | P | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Post ESC sign at the front of the sub-division where visable from the street. Will re-inspect on 6/25/10AM.
|
Issue & PRINT to be Invoiced | | | 6/24/2010 | | DONE |
|
|
|
|
Application received | | | 6/23/2010 | | |
|
|
|
|
Routing - Erosion and Sediment | 6/23/2010 | | 6/23/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC permit attached conditions.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/23/2010 | | |
|
|
|
|
Telephone call | | | 6/23/2010 | | DONE |
|
|
|
called Dan permit ready. ///dld 6-23-10
|
Permit Ready to Issue | | | 6/23/2010 | | |
|
|
|
|