General Inspection | 3/3/2011 | 3/3/2011 | 3/3/2011 | | DONE |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 3/3/2011 | 3/3/2011 | 3/3/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/31/2011 | 1/31/2011 | 1/31/2011 | | PASS |
Clint A Smith
|
|
|
Waiting on the spring to see the if the seed that was broadcasted with take.
|
General Inspection | 12/30/2010 | 12/30/2010 | 12/30/2010 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/15/2010 | 10/15/2010 | 10/15/2010 | P | PART |
Tony Young
|
|
|
work in progress
|
Random Inspection | 10/14/2010 | 10/14/2010 | 10/14/2010 | P | PART |
Tony Young
|
|
|
doing big clean up on Friday,, 15/ Oct 2010
|
Random Inspection | 9/21/2010 | 9/21/2010 | 9/21/2010 | P | PASS |
Jim Sly
|
|
|
John phone
|
Random Inspection | 8/19/2010 | 8/19/2010 | 8/19/2010 | A | PASS |
Daryl Spivey
|
|
|
site clean
|
BMP Violation | 8/6/2010 | 8/9/2010 | 8/10/2010 | A | PART |
Clint A Smith
|
|
|
verbal to RP: Must install a sediment barrier along the disturbed soil stock piles and the storm drain basin due to the unpredictiable trunderstorm weather pattern.
|
Site Preparation | 8/6/2010 | 8/6/2010 | 8/6/2010 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Provide sediment barrier along the perimeter the drainage pond. Where the area was excavated out for the concrete washout provide a sediment barrier. Also prior to any storm event, provide a sediment barrier along the driveway access of the lot to prevent sheet flow. Will re-inspect on 8/9/10am.
|
Conference | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | DONE |
Steven Webb
|
|
|
2:30 Discuss earlier correction notice: Agreed to allow no structure controls with the natural buffer on the upper portion of the project, based on the contractor agreeing to hydroseed with tack as soon as the walls have been backfilled. Lower section to have silt fence on the contour to protect stormwater basin. As well, sediment barrier on the downhill side of the washout pit properly installed. At night, sweep hard surface and position a sediment barrier to protect sheet flow. Install waste container. Any signifcate sediment entering into the basin will be the builders responsibility to clean out and re-spray.
|
Issue & PRINT permit SFD | | | 7/30/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 7/15/2010 | | 7/15/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and ESC permit conditions.
|
Application received | | | 7/1/2010 | | |
|
|
|
|