Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00519
StatusFinaled
Name JAYLEN R WALKER
Site Address 5073 E SAWMILL WAY
Project NameHARRIS RANCH #11
Customer Number 
ePlanReview 
Description
Vertical construction is not included for this permit, development only.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection1/14/20111/14/20111/14/2011 DONE
DetailsClint A Smith
Permit finalled.
DOC - Permit Finaled1/14/20111/14/20111/14/2011PPASS
DetailsClint A Smith
General Inspection12/30/201012/30/201012/30/2010 PASS
DetailsClint A Smith
Site is ready for vertical construction. But all of the area is still disturbed.
General Inspection8/17/20108/18/20108/18/2010APASS
DetailsClint A Smith
Discharge is clean.
General Inspection8/17/20108/17/20108/17/2010PDONE
DetailsClint A Smith
Directed to contractor to only discharge clean water into the wetland areas. NO turbid water with out a 404 permit is not allowed to be discharged into the wetland area. Will double check on 8/1/8/2010
General Inspection8/17/20108/17/20108/17/2010PPART
DetailsSteven Webb
As requested by the Contractor (Brown) met with inspector 460 and J. Brown to review dewatering of sewer trenches. Water is not infiltrating fast enough to keep work going. Well point had been inserted and according to the contractor a ACHD permit has been secured to use the existing stormwater basin to manage water. Since well casing and pump was pumping clean water it was suggested to use the outfall culvert to discharge the clean water offsite to reduce water volumn. It was stated directly to the contractor for compiance clean water only may be discharged offsite. This is the end which is expected, clean water discharges only offsite. Inspector 460 will follow up.
Site Preparation8/2/20108/4/20108/4/2010PPASS
DetailsClint A Smith
All provisions have been aquired for the discharge within the wetland area. Utility work will be occuring within the next two weeks.
Conference8/4/20108/4/20108/4/2010PDONE
DetailsSteven Webb
2:00 p.m: Reviewed stormwater drainage pond stabilization procedures and requirements with RP, J. Walker. Also, reviewed upcoming phase scope of work.
Site Preparation8/2/20108/4/20108/4/2010PCANC
DetailsSteven Webb
2pm: Conference not site preparation
Site Preparation7/29/20108/2/20108/2/2010ANR
DetailsClint A Smith
Site Preparation7/29/20107/29/20107/29/2010 FAIL
DetailsClint A Smith
Setting up a meeting with the RP over drainage concerns with the site developement.
Issue & PRINT permit COM  7/22/2010 DONE
Routing - Erosion and Sediment7/6/2010 7/6/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions.
PLANS/APPL TAKEN TO FRONT DESK  7/6/2010  
Telephone call  7/6/2010 DONE
t/c w jay at ###-#### - permit ready and fees given
Permit Ready to Issue  7/6/2010 DONE
Details
Application received  7/1/2010  
Routing - Erosion and Sediment7/1/2010   PEND
DetailsSteven Webb