Permit Information
Permit NumberESC10-00533
StatusFinaled
Name ROBERT GRUBB
Site Address 2495 E WARM SPRINGS AVE
Project NameMaint. Facility Construction
Customer Number 
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final5/5/20115/5/20115/5/2011PPASS
DetailsDave Hannah
General Inspection4/28/20114/28/20114/28/2011 PASS
DetailsClint A Smith
General Inspection3/30/20113/30/20113/30/2011 PASS
DetailsSteven Webb
No problems observed, according to the course maintenance supervisor the parking lot is scheduled for paving in April and then re-vegeation of misc areas will occur.
General Inspection3/15/20113/15/20113/15/2011 PASS
DetailsClint A Smith
General Inspection2/28/20112/28/20112/28/2011 PASS
DetailsClint A Smith
Waiting on paving to occur.
General Inspection2/11/20112/11/20112/11/2011 PASS
DetailsClint A Smith
General Inspection1/27/20111/27/20111/27/2011PPART
DetailsTony Young
sign is still posted
General Inspection1/24/20111/24/20111/24/2011 PASS
DetailsClint A Smith
Random Inspection1/7/20111/7/20111/7/2011PPART
DetailsSteven Webb
Overall things are ok, but sign has been removed and the 2nd protection around the parking lots drop inlet should be maintained.
General Inspection12/30/201012/30/201012/30/2010 PASS
DetailsClint A Smith
Tracking Control12/14/201012/15/201012/15/2010APASS
DetailsClint A Smith
BMP Violation12/10/201012/14/201012/14/2010ACANC
DetailsClint A Smith
Per SGW
Verbal to RP:
Install the stabilized construction exit by the end of the day or stop work order will be issued. Will re-inspect on 12/14/2010am.
Random Inspection12/10/201012/10/201012/10/2010PFAIL
DetailsSteven Webb
Discharge of turbid water observed from mud tracked onto parking lot hard surface. Verbal to RP (Robert) protect both drop inlets and install an acceptable construction entrance, (fabric and 4-8" of washed rock). Will re-inspect on Tuesday 12/14/10.
Site Preparation10/18/201010/18/201010/18/2010APART
DetailsDave Hannah
still needs washout and sign posted
Site Preparation10/8/201010/8/201010/8/2010 PART
DetailsSteven Webb
Work just starting, Verbal to RP, post signage, silt fence or wattle is not needed because building site is surrounded by the same owner, (W.S. Golf Course) which is fully vegetated. Washout details were reviewed and is required as well as trash container.
Issue & PRINT permit COM  10/1/2010 DONE
Routing - Erosion and Sediment8/18/2010 8/18/2010 PASS
DetailsClint A Smith
ESC plan approved per the attached conditions.
Routing - Erosion and Sediment8/13/2010 8/13/2010 FAIL
DetailsClint A Smith
ESC plan waived denied due to the size and the location of the project. Notifed Parks and Rec and the achitect of the denial of the plan waive. Must provide an esc plan and narritive.
Application received  7/13/2010