Site Final | 8/25/2010 | 8/26/2010 | 8/26/2010 | A | PASS |
Jim Sly
|
|
|
Wade phone
|
DOC - Permit Finaled | 8/26/2010 | 8/26/2010 | 8/26/2010 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 8/6/2010 | 8/6/2010 | 8/6/2010 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 7/20/2010 | 7/21/2010 | 7/21/2010 | A | CANC |
Clint A Smith
|
|
|
Completed by 450
|
Site Preparation | 7/20/2010 | 7/20/2010 | 7/20/2010 | | CANC |
Clint A Smith
|
|
|
|
Site Preparation | 7/20/2010 | 7/20/2010 | 7/20/2010 | A | PASS |
Mike Jordan
|
|
|
ESC permit sign posted. Excavated soils hace already ben removed from the job site. Cleanout will be done back into the concrete truck from the pump. No washout required due to small size of job.
|
Application received | | | 7/13/2010 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 7/13/2010 | | DONE |
|
|
|
|