Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberESC10-00540
StatusFinaled
Name MICHAEL SPROUFFSKE
Site Address 3491 S TK AVE
Project Name 
Customer Number 
ePlanReview 
Description
Building Expansion
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (ESC)  6/1/2016 DONE
Site Final4/11/20114/11/20114/11/2011PPASS
DetailsJim Storey
DOC - Permit Finaled4/11/20114/11/20114/11/2011PPASS
DetailsJim Storey
General Inspection3/8/20113/8/20113/8/2011 PART
DetailsClint A Smith
Discussed with RP over the clean up of the areato the north of the building. Concrete washout must be removed and disposed of properly. After the lot is cleanedup then it must have final stabilization practice initiated. Will re-inspect once the next general inspection is created by the inspection report.
Random Inspection1/21/20111/21/20111/21/2011PPASS
DetailsJim Storey
p$z bond for landscaping will remain esc until complet.
General Inspection1/20/20111/20/20111/20/2011PPASS
DetailsBob Reichert
looked ok
Random Inspection12/27/201012/27/201012/27/2010APASS
DetailsJim Storey
Random Inspection12/22/201012/23/201012/23/2010PPASS
DetailsJim Storey
Random Inspection11/3/201011/3/201011/3/2010APASS
DetailsJim Storey
Random Inspection11/2/201011/2/201011/3/2010PPASS
DetailsJim Storey
BMP Violation10/28/201011/1/201011/1/2010APASS
DetailsClint A Smith
All issues have been corrected.
Random Inspection10/28/201010/28/201010/28/2010PPART
DetailsSteven Webb
Verbal to RP, trash pile on hard surface needs to be containerized in the on site dumpster, washout pit needs to be maintained, (full) and misc. material outside the pit. Sweep hard surfaces prior to rain which is forecasted over the weekend. Will follow up.
Random Inspection10/25/201010/25/201010/25/2010APASS
DetailsJim Storey
Random Inspection10/19/201010/19/201010/19/2010APASS
DetailsJim Storey
Random Inspection10/13/201010/13/201010/13/2010APASS
DetailsJim Storey
Site Preparation9/27/20109/27/20109/28/2010 NR
DetailsJim Storey
Issue & PRINT permit COM  9/20/2010  
Routing - Erosion and Sediment7/26/2010 7/26/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC plan and ESC permit conditions.
Application received  7/14/2010