Site Final | 12/30/2011 | 12/30/2011 | 12/30/2011 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 12/30/2011 | 12/30/2011 | 12/30/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 12/12/2011 | 12/12/2011 | 12/12/2011 | | PASS |
Eric Strole
|
|
|
|
General Inspection | 11/10/2011 | 11/10/2011 | 11/18/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 10/10/2011 | 10/10/2011 | 10/10/2011 | | PASS |
Eric Strole
|
|
|
site looks good
|
General Inspection | 9/8/2011 | 9/8/2011 | 9/9/2011 | | CANC |
Eric Strole
|
|
|
|
General Inspection | 8/8/2011 | 8/8/2011 | 8/8/2011 | | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/5/2011 | 7/8/2011 | 7/8/2011 | A | PASS |
Clint A Smith
|
|
|
|
BMP Violation | 7/1/2011 | 7/5/2011 | 7/5/2011 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Provide sediment barrier protection for the stockpile within the alleyway. Remove stockpile along the fenceline on Longmont where it is spilling onto the sidewalk. Will follow up on 7/8/2011AM.
|
Site Preparation | 7/1/2011 | 7/1/2011 | 7/1/2011 | P | FAIL |
Clint A Smith
|
|
|
Message to RP: Left a message with RP to set up a meeting to go over the ESC plan on 7/5/2011. Waiting on a call , but will return on 7/5/2011 for further enforcement.
|
General Inspection | 6/6/2011 | 6/6/2011 | 6/7/2011 | | PART |
Clint A Smith
|
|
|
nO ACTIVITY
|
General Inspection | 5/5/2011 | 5/5/2011 | 5/6/2011 | | PASS |
Jim Storey
|
|
|
No activity
|
Random Inspection | 4/4/2011 | 4/4/2011 | 4/4/2011 | P | PASS |
Jim Storey
|
|
|
|
General Inspection | 3/7/2011 | 3/7/2011 | 3/7/2011 | | DONE |
Clint A Smith
|
|
|
No activity
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | | DONE |
Clint A Smith
|
|
|
No activity. BLD will not expire till 7/2/2011.
|
General Inspection | 1/4/2011 | 1/4/2011 | 1/4/2011 | | NR |
Clint A Smith
|
|
|
No activity
|
Issue & PRINT permit COM | | | 1/3/2011 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 8/12/2010 | | 8/12/2010 | | PASS |
Clint A Smith
|
|
|
ESC plan aprroved per the attached conditions.
|
Application received | | | 7/16/2010 | | |
|
|
|
|
Routing - Erosion and Sediment | 7/20/2010 | | | | FAIL |
|
|
|
Plan waiver request is denied due to the activities of the project and the location of the project area. An Erosion Cntrol plan is required. Inform the applicant of the requirement and the denial of the waiver request.
|