Site Final | 10/14/2010 | 10/14/2010 | 10/14/2010 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/14/2010 | 10/14/2010 | 10/14/2010 | P | PASS |
Mike Jordan
|
|
|
70% stabalization amd revegetation achivied.
|
Complaint Inspection | 9/28/2010 | 9/28/2010 | 9/28/2010 | P | DONE |
Clint A Smith
|
|
|
Contacted RP of the project and advised him to you some sort dust control meathod when being active with dry dirt. Also contacted the complaintee and told him of the actions that we took.
|
Random Inspection | 9/13/2010 | 9/13/2010 | 9/13/2010 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 9/10/2010 | 9/10/2010 | 9/10/2010 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 8/25/2010 | 8/25/2010 | 8/25/2010 | | CANC |
Clint A Smith
|
|
|
|
BMP Violation | 8/20/2010 | 8/20/2010 | 8/20/2010 | A | PASS |
Mike Jordan
|
|
|
Washout has been provided, and drain inlet protection has been changed out.
|
Site Preparation | 8/19/2010 | 8/19/2010 | 8/19/2010 | A | PART |
Mike Jordan
|
|
|
ESC permit sign posted. Needs to provide concrete washout adn replace drain inlet protection. RP notified via verbal correction notice. Concrete washout to be in place prior to ant concrete being placed.
|
Issue & PRINT permit SFD | | | 8/18/2010 | | DONE |
|
|
|
|
Application received | | | 7/22/2010 | | |
|
|
|
|