Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberESC10-00573
StatusFinaled
Name MATT BROWN
Site Address 1650 E HOLLY ST
Project Name 
Customer Number 
ePlanReview 
Description
C-1 ranking based on location close to the Boise River-SGW
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/16/20124/16/20124/16/2012APASS
DetailsDave Hannah
DOC - Permit Finaled4/16/20124/16/20124/16/2012PPASS
DetailsDave Hannah
General Inspection4/5/20124/5/20124/5/2012 PASS
DetailsDaryl Spivey
General Inspection3/5/20123/5/20123/5/2012 PASS
DetailsClint A Smith
General Inspection2/3/20122/3/20122/3/2012 PASS
DetailsClint A Smith
General Inspection1/3/20121/3/20121/4/2012 PASS
DetailsEric Strole
General Inspection11/28/201111/28/201111/28/2011 PASS
DetailsDaryl Spivey
site clean
General Inspection10/27/201110/27/201110/28/2011 CANC
DetailsEric Strole
General Inspection9/26/20119/26/20119/26/2011 PASS
DetailsEric Strole
General Inspection8/25/20118/25/20118/26/2011 PASS
DetailsEric Strole
General Inspection7/25/20117/25/20117/25/2011 PASS
DetailsDave Hannah
General Inspection6/23/20116/23/20116/23/2011 PASS
DetailsClint A Smith
General Inspection5/23/20115/23/20115/23/2011 PASS
DetailsClint A Smith
Random Inspection4/22/20114/22/20114/22/2011PPASS
DetailsTroy James
General Inspection4/5/20114/5/20114/7/2011 PART
DetailsDave Hannah
drove around site looks ok dident have site plan so I cant tell if lay out is per plan
General Inspection3/4/20113/4/20113/4/2011 PASS
DetailsClint A Smith
Site in good condition.
General Inspection2/1/20112/1/20112/1/2011 PASS
DetailsClint A Smith
General Inspection12/31/201012/31/20101/3/2011 CANC
DetailsSteven Webb
HOLIDAY
Random Inspection9/13/20109/13/20109/13/2010PPASS
DetailsDaryl Spivey
General Inspection9/2/20109/3/20109/3/2010APASS
DetailsClint A Smith
General Inspection8/27/20109/1/20109/1/2010APART
DetailsClint A Smith
In the process of installing there sediment barrier correctly.
Random Inspection8/30/20108/30/20108/31/2010AFAIL
DetailsDave Hannah
steve and clent are working on this I talked with home owner he will call his contractor and get steves c/n items done
Site Preparation8/27/20108/27/20108/27/2010 PART
DetailsSteven Webb
Verbal to RP: Remove concrete material from ground surface and place in dumpster or wash out pit. Sediment barrier (straw wattle) around the pond and ditch not installed correctly, not staked or trenched in. Complete all corrections by the end of the day of Monday, Aug. 30. Re-inspection will occurr Tuesday or Wednesday. Also, questioned operator about area of disturbance and the possilbe need to secure coverage with EPA under the Construction General Permit.
Issue & PRINT permit SFD  8/20/2010 DONE
Application received  7/27/2010