General Inspection | 9/9/2011 | 9/9/2011 | 9/9/2011 | | DONE |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 9/9/2011 | 9/9/2011 | 9/9/2011 | P | PASS |
Jim Johnson
|
|
|
|
General Inspection | 7/25/2011 | 7/25/2011 | 7/29/2011 | | PASS |
Jim Johnson
|
|
|
|
General Inspection | 5/31/2011 | 5/31/2011 | 6/9/2011 | | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 6/9/2011 | 6/9/2011 | 6/9/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/12/2011 | 4/12/2011 | 4/12/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 2/25/2011 | 2/25/2011 | 2/25/2011 | | PASS |
Clint A Smith
|
|
|
|
Tracking Control | 1/3/2011 | 1/10/2011 | 1/10/2011 | A | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/3/2011 | 1/3/2011 | 1/3/2011 | | FAIL |
Clint A Smith
|
|
|
Message to RP: Clean up all hard surfaces of all sediment and debris. Also maintain all storm drain inlet protection. Will re-inspect on 1/10/2011AM.
|
Site Preparation | 11/12/2010 | 11/15/2010 | 11/15/2010 | A | PASS |
Jim Sly
|
|
|
Dan phone
|
Site Preparation | 11/12/2010 | 11/12/2010 | 11/12/2010 | P | CANC |
Jim Sly
|
|
|
Dan phone....Re-sched.....
|
Site Preparation | 11/11/2010 | 11/12/2010 | 11/12/2010 | A | CANC |
Jim Sly
|
|
|
Re-sched for PM.
|
Site Preparation | 11/9/2010 | 11/9/2010 | 11/9/2010 | | PART |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 11/2/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/22/2010 | | 9/22/2010 | | PASS |
Steven Webb
|
|
|
ESC plan under masterplan ESC09-00605 is approved according to the ESC permit attached conditions.
|
Application received | | | 8/11/2010 | | |
|
|
|
|