General Inspection | 3/7/2011 | 3/7/2011 | 3/7/2011 | | DONE |
Clint A Smith
|
|
|
Permit finalled
|
DOC - Permit Finaled | 3/7/2011 | 3/7/2011 | 3/7/2011 | P | PASS |
Clint A Smith
|
|
|
|
General Inspection | 1/3/2011 | 1/3/2011 | 1/3/2011 | | PASS |
Clint A Smith
|
|
|
Not ready to final.
|
General Inspection | 9/8/2010 | 9/10/2010 | 9/10/2010 | A | PART |
Clint A Smith
|
|
|
Updated RP.
|
Site Preparation | 9/7/2010 | 9/8/2010 | 9/8/2010 | A | FAIL |
Clint A Smith
|
|
|
Verbal to RP: Must update RP information with the city. Notified that the Pocketed Silt fence was installed incorrectly. Also told to add in additional stakes inbetween each section between the pocketed stakes to alter the silt fence to a standard style silt fence. But I informed him that per the CGP thaT ALL BMP's must be installed per manufacture specifications. Will follow up on 9/10/10am
|
Site Preparation | 9/3/2010 | 9/7/2010 | 9/7/2010 | A | CANC |
Clint A Smith
|
|
|
moved until 9am on 9/8/10am
|
Site Preparation | 9/2/2010 | 9/2/2010 | 9/3/2010 | | DONE |
Clint A Smith
|
|
|
Project has begun. Waiting to set-up a time to inspect.
|
Issue & PRINT permit COM | | | 8/26/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 8/20/2010 | | 8/20/2010 | | PASS |
Steven Webb
|
|
|
ESC plan is approved according to the ESC plan and the ESC permit conditions.
|
Application received | | | 8/11/2010 | | |
|
|
|
|