Site Final | 11/17/2010 | 11/17/2010 | 11/17/2010 | A | PASS |
Jim Storey
|
|
|
|
General Inspection | 11/15/2010 | 11/15/2010 | 11/15/2010 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
BMP Violation | 10/12/2010 | 10/12/2010 | 10/12/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, maintain storm drain protections and post signage.
|
Random Inspection | 10/11/2010 | 10/11/2010 | 10/11/2010 | P | PART |
Steven Webb
|
|
|
Verbal to RP, post sign, cleanup non-water based products from the surface of the ground. Will follow up.
|
Random Inspection | 10/6/2010 | 10/6/2010 | 10/6/2010 | P | PASS |
Jim Storey
|
|
|
|
Random Inspection | 10/1/2010 | 10/1/2010 | 10/1/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 9/10/2010 | 9/10/2010 | 9/10/2010 | | CANC |
Steven Webb
|
|
|
Inspector 301 passes on 9/7/10
|
Random Inspection | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | PASS |
Jim Storey
|
|
|
|
Site Preparation | 9/7/2010 | 9/7/2010 | 9/7/2010 | P | PASS |
Jim Storey
|
|
|
|
Issue & PRINT permit SFD | | | 9/3/2010 | | DONE |
|
|
|
|
Application received | | | 8/19/2010 | | |
|
|
|
|