Permit Information
Permit NumberESC10-00643
StatusFinaled
Name ADAM LYMAN
Site Address 421 E HIGHLAND VIEW DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Slope repair and stabilization
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final6/2/20116/6/20116/6/2011ADONE
DetailsClint A Smith
Permit has ben finaled.
Site Final5/5/20116/5/20116/2/2011ACANC
DetailsClint A Smith
Wrong Date
Site Final5/26/20115/26/20115/27/2011PDONE
DetailsSteven Webb
DOC - Permit Finaled5/27/20115/27/20115/27/2011APASS
DetailsSteven Webb
Site stablized.
Site Final12/17/20105/6/20115/5/2011PNR
DetailsClint A Smith
Have not acheived at least 70% of vegatation on the disturbed areas. Will re-inspect in one month.
General Inspection12/21/201012/21/201012/21/2010APART
DetailsSteven Webb
Inquired with PD (Adam L.) regarding rock checks between the sediment barriers. ESC workgroup will continue to monitor area until final stabilization has been achieved.
General Inspection12/17/201012/17/201012/17/2010PPASS
DetailsSteven Webb
Access roadway: Sediment barriers installed numberous locations downslope, site was hydroseeded along with organic materials and N-P-K according to soils analysis. Roadway ditch also restored. ESC permit to remain in place until site has re-vegetated in the Spring or early summer. Photo's taken.
General Inspection10/27/201010/27/201010/27/2010APASS
DetailsClint A Smith
General Inspection10/15/201010/22/201010/22/2010PPASS
DetailsClint A Smith
All temporary measures are inplace. They have not applied seed tach and mulch on the access channel up to the lot.
General Inspection10/8/201010/22/201010/21/2010PCANC
DetailsSteven Webb
duplicate
General Inspection10/18/201010/18/201010/18/2010APART
DetailsClint A Smith
Sie looks good. All permit conditions and plan conditions are being achieved.
General Inspection10/15/201010/15/201010/15/2010PPART
DetailsSteven Webb
Bare ground remains but slope is protected and access road has sediment barriers in place. Will re-inspect in a week.
General Inspection10/1/201010/8/201010/8/2010PPART
DetailsSteven Webb
Slope is protected but access road remains bare, will follow up in two weeks.
Site Preparation10/7/201010/7/201010/7/2010PPART
DetailsSteven Webb
Blanket needs to be toed in at top of the slope. Slope is hydro-seeded and then the blanket installed. I observed minor "tenting" at misc. locations but hopefully will be ok. Energy relieve (basalt rock) is inplace at the bottome of the seeded slope at the bottom of the buried slope pipe. Informed RP of my comments and observations.
General Inspection9/24/201010/1/201010/1/2010PPART
DetailsSteven Webb
Verbal to RP, need to install sediment barriers at misc locations to reduce runoff with forecasted rain. Backfilled elevation has been completed but seeding and installation of slope has not been done at the time of this inspection. Access road has bare ground. Final stabilzation is needed on all bare ground.
General Inspection9/17/20109/24/20109/24/2010PPASS
DetailsSteven Webb
Failed slope continues to be backfilled, Elevation of fill is very near the finish elevation. Then final slope preparation will be need, seed, rolled erosion control blanket and re-grading and stabilization of the access road from the elevation below the slope. Will follow up in one week.
General Inspection9/16/20109/17/20109/17/2010PPASS
DetailsSteven Webb
Progress with restablizing the slope. Talked to RP (Adam) regarding the final restoration including the access road, high rate of mulch, tackifier and upland seed mix on material that will produce re-vegetation. Also, install sediment barriers which will be left in place to reduce velocity of runoff until the site is completely revegetated. Will re-inspect in one week.
Site Preparation9/10/20109/10/20109/10/2010PPASS
DetailsSteven Webb
Work is progressing to restore the slope; At the time of inspection 13 feet of geogrid and 3/4 road mix has been placed. Discussed the need to place sediment barriers in misc. locations at the end of the day on the project access road. Estimated completion to place material--two more weeks and it should be close to the end.
Site Preparation9/7/20109/7/20109/8/2010 PASS
DetailsSteven Webb
Geo-grid in place and 2 foot lifts are being constructed. At the time of inspection placement of 3/4" material was being installed via a conveyer from below and then compaction of material. Reviewed the need to install sediment barriers (straw wattles) every night to reduce velocity and to trap sediment overnight in case of rainfall.
General Inspection9/7/20109/7/20109/7/2010APART
DetailsClint A Smith
Installing energy disapators within the channel down the slope after work every day. Will be inspecting on 9/9/10am.
Site Preparation9/1/20109/1/20109/1/2010APART
DetailsClint A Smith
Verbal to RP:
Prior to any storm event, must install energy disapators along the cut slope and install sediment barriers at the bottom of slope.
Issue & PRINT permit SFD  8/31/2010 DONE
Routing - Erosion and Sediment8/23/2010 8/23/2010 PASS
DetailsSteven Webb
ESC plan is approved according to the ESC Plan and ESC Permit conditions.
Telephone call  8/23/2010 DONE
t/c w adam at ###-#### - permit ready and fees given
Permit Ready to Issue  8/23/2010 DONE
Details
Conference8/20/20108/20/20108/20/2010PDONE
DetailsSteven Webb
Met with T.Records, B. Archibald and A. Lyman at City Hall. Reviewed details pertaining to slope repair and stabilization. Permits in Recieve status. Travel to the site and collected photographs from 8th street side. Pre-work photos will be attached under the ESC permit case.
Application received  8/20/2010