Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberESC10-00672
StatusFinaled
Name KEVIN ANDERSON
Site Address 2578 S PERRAULT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final12/20/20104/20/20114/20/2011APASS
DetailsDave Hannah
DOC - Permit Finaled4/20/20114/20/20114/20/2011PPASS
DetailsDave Hannah
Tracking Control12/22/201012/23/201012/23/2010APASS
DetailsClint A Smith
Tracking Control12/22/201012/22/201012/22/2010PFAIL
DetailsClint A Smith
Message to RP:
Clean up all sediment and debris within the alley of the lot from the final grade cut on the lot. Will re-inspect on 12/23/2010AM.
Site Final12/20/201012/20/201012/20/2010AFAIL
DetailsDave Hannah
needs to land scape
Random Inspection12/14/201012/14/201012/14/2010APASS
DetailsTroy James
ok
Random Inspection11/3/201011/3/201011/3/2010PPASS
DetailsDave Hannah
Random Inspection10/27/201010/27/201010/27/2010APASS
DetailsTroy James
BMP Violation10/4/201010/5/201010/5/2010APASS
DetailsClint A Smith
BMP Violation10/1/201010/4/201010/4/2010AFAIL
DetailsClint A Smith
Spoke with RP and was told that all grades over 2% will be protected this morning. Will follow-up on 10/5/2010am.
Random Inspection10/4/201010/4/201010/4/2010APASS
DetailsDave Hannah
Site Preparation10/4/201010/4/201010/4/2010 CANC
DetailsClint A Smith
Refer to BMP Violation inspection.
Conference9/29/201010/1/201010/1/2010AFAIL
DetailsClint A Smith
Verbal to RP:
Maintain inlet protection within the alley way.
Clean up all concrete residual within the valley gutter into the storm drain. Provide sediment barrier throught there project area where slopes are over 2% grade slopes. Will re-inspect on 10/4/2010am.
Conference9/29/201010/1/201010/1/2010ADONE
DetailsSteven Webb
9:00 A.M.: Met with ACHD, (Tom D.), Inspector 460, RP (Kevin A.) and two other reps from Hunter Homes. Reviewed Federal and local regulations. Handed a copy of the local general ESC conditions to the RP. Compliance is expected.
Site Preparation9/30/20109/30/20109/30/2010PPASS
DetailsDave Hannah
Issue & PRINT permit SFD  9/27/2010  
Application received  9/2/2010