Information based on query as of Wednesday, August 14, 2024.
Permit Information
Permit NumberESC10-00675
StatusFinaled
Name KEVIN ANDERSON
Site Address 2590 S PERRAULT WAY
Project Name 
Customer Number 
ePlanReviewNo
Description
Per attached ESC conditions
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Aging Inspection6/14/20116/14/20116/14/2011 PASS
DetailsEric Strole
DOC - Permit Finaled6/14/20116/14/20116/14/2011PPASS
DetailsEric Strole
BMP Violation4/14/20114/18/20114/18/2011APART
DetailsClint A Smith
Waiting on storm drains to be maintained.
Site Final1/24/20114/15/20114/15/2011ANR
DetailsDave Hannah
BMP Violation4/14/20114/14/20114/14/2011PFAIL
DetailsClint A Smith
Message to RP:
Clean up all sediment tracked from the landscaping activities. Also maintain all storm drain inlet protection through out the project area where inlet protection maintenance needs to occur. Will reinspect on 4/18/2011AM.
Site Final1/24/20111/24/20111/24/2011PFAIL
DetailsDave Hannah
needs to land scape lot
Tracking Control11/8/201011/9/201011/9/2010APASS
DetailsClint A Smith
Random Inspection11/8/201011/8/201011/8/2010APASS
DetailsDave Hannah
BMP Violation11/5/201011/8/201011/8/2010APART
DetailsClint A Smith
Message to RP:
All issues have been corrected.
Clean up all tracking on roadways where concrete trucks have pulled on and off the lots.
BMP Violation11/5/201011/5/201011/5/2010AFAIL
DetailsClint A Smith
**FINAL NOTICE**
1. Clean up all concrete residual that is not in a containment.
2. Provide a stabilized construction exit onto the disturbed area where spoil piles are being placed.
3. Provide a concrete washout for all further concrete work or for all non storm water pollutant clean out.
4. Re-install the sediment barrier at the east end of the project area per industry standards.
Failure to comply will result in a STOP WORK ORDER. Will re-inspect on 11/8/10 AM.
Random Inspection10/4/201010/4/201010/4/2010APASS
DetailsDave Hannah
Site Preparation10/4/201010/4/201010/4/2010 PASS
DetailsClint A Smith
Site Preparation9/30/20109/30/20109/30/2010PPASS
DetailsDave Hannah
Issue & PRINT permit SFD  9/27/2010 DONE
Application received  9/3/2010