Permit Information
Permit NumberESC10-00687
StatusFinaled
Name CREED HERBOLD
Site Address 1884 E DANMOR DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Exploration activities for building settlement.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection9/15/20119/15/20119/15/2011 DONE
DetailsClint A Smith
Permit finaled.
DOC - Permit Finaled9/15/20119/15/20119/15/2011PPASS
DetailsClint A Smith
General Inspection8/15/20118/15/20118/16/2011 PART
DetailsDave Hannah
Case Summary (ESC)  8/10/2011 DONE
General Inspection7/14/20117/14/20117/14/2011 PASS
DetailsClint A Smith
General Inspection6/13/20116/13/20116/13/2011 PASS
DetailsClint A Smith
General Inspection5/10/20115/13/20115/13/2011APASS
DetailsClint A Smith
Site Preparation5/10/20115/10/20115/10/2011APART
DetailsClint A Smith
Stop work order lifted.
Verbal to RP:
Sweep up the gutterpan of all sediment and debris. Remove the sand bag within the gutterpan. Maintain the storm drain inlet protection. Also provide a washout for all non storm water pollunants. Will follow up on 5/13/2011AM
Site Preparation5/9/20115/11/20115/10/2011ACANC
DetailsClint A Smith
Moved to 5/10/2011
Stop Work Order5/9/20115/9/20115/10/2011PDONE
DetailsClint A Smith
(F) Reprint permit  5/10/2011 DONE
General Inspection5/9/20115/9/20115/9/2011 CANC
DetailsClint A Smith
Moved to a Complaint Inspection. STOP WORK ORDER is in place.
Complaint Inspection5/9/20115/9/20115/9/2011PFAIL
DetailsClint A Smith
STOP WORK ORDER.
1.Clean up all sediment off of all hard sufaces.
2. Sweep up street with a street sweeper, not washed with water.
3. Install sediment barriers along the front perimeter of project.
4. Maintain the storm drain inlet protection.
5. Provide a "Valid" RP that has day to day control over operations in regards with erosion and sediment control.
Will release the Stop Work Order once all issues have been corrected.
General Inspection4/7/20114/7/20114/7/2011 CANC
DetailsClint A Smith
Completed by 425
General Inspection3/7/20113/7/20113/7/2011 PASS
DetailsDave Hannah
General Inspection2/4/20112/4/20112/4/2011 PASS
DetailsClint A Smith
General Inspection1/4/20111/4/20111/4/2011 PASS
DetailsClint A Smith
Site Preparation9/16/20109/16/20109/16/2010 PART
DetailsClint A Smith
Verbal to RP:
Prior to a storm event, cover the stock pile with visquen or remove sockpile located in the drive way.
Routing - Erosion and Sediment9/8/2010 9/9/2010 PASS
DetailsSteven Webb
The ESC plan is approved according to the ESC plan and ESC permit conditions.
PLANS/APPL TAKEN TO FRONT DESK  9/9/2010  
Permit Ready to Issue  9/9/2010 DONE
DetailsBarbara Stitt
Telephone call  9/9/2010 DONE
DetailsBarbara Stitt
Left voice message for Creed Herbold that permit is ready on 9-9-10 @ 9:15am
Issue & PRINT permit SFD  9/9/2010 DONE
Application received  9/8/2010