Site Final | 5/13/2011 | 5/16/2011 | 5/16/2011 | A | DONE |
Tom Arcoraci
|
|
|
|
Site Final | 5/13/2011 | 5/16/2011 | 5/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 5/13/2011 | 5/13/2011 | 5/13/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 4/28/2011 | 4/28/2011 | 4/28/2011 | | PASS |
Steven Webb
|
|
|
No problems observed.
|
BMP Violation | 3/18/2011 | 3/18/2011 | 3/18/2011 | A | PART |
Clint A Smith
|
|
|
Need to just sweep up area at the end of the day.
|
General Inspection | 3/17/2011 | 3/17/2011 | 3/18/2011 | P | FAIL |
Clint A Smith
|
|
|
Message left to RP: CORRECTION NOTICE 1.Protectall storm drains including the one within the planter box. 2. CLean up all stucco, mortar, and/or concrete residual off of all hard surfaces and within the the planter box. **Failure to comply within the given time frame will result in a stop work order. Will re-inspect on 3/18/2011AM.
|
General Inspection | 3/10/2011 | 3/11/2011 | 3/11/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/17/2011 | 2/17/2011 | 2/17/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 2/16/2011 | 2/16/2011 | 2/16/2011 | A | PASS |
Tom Arcoraci
|
|
|
|
General Inspection | 2/4/2011 | 2/4/2011 | 2/4/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 2/2/2011 | 2/2/2011 | 2/2/2011 | P | PASS |
Bob Reichert
|
|
|
looked ok
|
General Inspection | 1/6/2011 | 1/7/2011 | 1/7/2011 | P | PASS |
Tom Arcoraci
|
|
|
|
Random Inspection | 12/23/2010 | 12/23/2010 | 12/23/2010 | P | PASS |
Tom Arcoraci
|
|
|
|
Site Preparation | 11/9/2010 | 11/9/2010 | 11/9/2010 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 11/2/2010 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/16/2010 | | 9/16/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC Permit conditions.
|
Application received | | | 9/9/2010 | | |
|
|
|
|