Site Final | 3/21/2011 | 3/21/2011 | 3/21/2011 | A | PASS |
Daryl DeGrange
|
|
|
job site clean, landscape all in- filter removed
|
General Inspection | 1/27/2011 | 1/27/2011 | 1/27/2011 | P | PART |
Tony Young
|
|
|
will clean at the end of the day
|
General Inspection | 1/26/2011 | 1/26/2011 | 1/26/2011 | A | PASS |
Bob Reichert
|
|
|
looked ok
|
Random Inspection | 11/22/2010 | 11/22/2010 | 11/22/2010 | P | PASS |
Dave Hannah
|
|
|
|
Random Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Dave Hannah
|
|
|
|
Tracking Control | 10/6/2010 | 10/7/2010 | 10/18/2010 | P | PASS |
Clint A Smith
|
|
|
|
Site Preparation | 10/6/2010 | 10/6/2010 | 10/6/2010 | | FAIL |
Clint A Smith
|
|
|
Verbal message to RP: 1. Clean up all tracking in the alleys ways and streets from lots to the commen washout. Will re-inspect 10/7/2010pm.
|
Issue & PRINT permit SFD | | | 9/29/2010 | | DONE |
|
|
|
|
Application received | | | 9/10/2010 | | |
|
|
|
|