Aging Inspection | 6/16/2011 | 6/16/2011 | 6/17/2011 | | CANC |
Mike Jordan
|
|
|
|
Site Final | 6/17/2011 | 6/17/2011 | 6/17/2011 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 6/17/2011 | 6/17/2011 | 6/17/2011 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 2/10/2011 | 2/10/2011 | 2/10/2011 | P | PART |
Mike Jordan
|
|
|
Noted some additional concrete work that was done in back, workers left large amounta of trackout onto hiawatha st. Called and left verbal correction notice with RP that trac kout needed to be removed.
|
Site Final | 1/11/2011 | 1/11/2011 | 1/11/2011 | A | FAIL |
Mike Jordan
|
|
|
Final stabalization not yet completed.
|
BMP Violation | 11/19/2010 | 11/19/2010 | 11/19/2010 | A | PASS |
Mike Jordan
|
|
|
|
General Inspection | 11/16/2010 | 11/16/2010 | 11/16/2010 | P | PART |
Mike Jordan
|
|
|
Needs to sweep silts from gutterpan and sidewalk. Correction notice posted.
|
Site Preparation | 10/26/2010 | 10/26/2010 | 10/26/2010 | | CANC |
Steven Webb
|
|
|
Inspector 450 passed 10/21/10
|
BMP Violation | 10/21/2010 | 10/21/2010 | 10/21/2010 | P | PASS |
Mike Jordan
|
|
|
ESC signposted, washout was provided.
|
Site Preparation | 10/20/2010 | 10/20/2010 | 10/20/2010 | P | PART |
Mike Jordan
|
|
|
Needs to provide ESC sign and washout. RP was notified. No concrete until washout has been placed.
|
Issue & PRINT permit SFD | | | 10/19/2010 | | DONE |
|
|
|
|
Application received | | | 10/4/2010 | | |
|
|
|
|