Site Final | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 12/20/2010 | 12/20/2010 | 12/20/2010 | P | PASS |
Mike Jordan
|
|
|
|
Random Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Jim Sly
|
|
|
Kevin phone
|
Random Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | CANC |
Jim Sly
|
|
|
Kevin re-sched....
|
General Inspection | 11/19/2010 | 11/19/2010 | 11/19/2010 | P | PASS |
Jack Frank
|
|
|
|
Site Preparation | 10/14/2010 | 10/14/2010 | 10/20/2010 | | CANC |
Jim Sly
|
|
|
|
Site Preparation | 10/19/2010 | 10/19/2010 | 10/19/2010 | P | PART |
Jim Sly
|
|
|
C/N........Do not pour without concrete wash out pit. Protection around excavated dirt pile/street.
|
Application received | | | 10/7/2010 | | |
|
|
|
|
Issue & PRINT permit SFD | | | 10/7/2010 | | DONE |
Barbara Stitt
|
|
|
|