Site Final | 5/4/2011 | 5/9/2011 | 5/9/2011 | A | PASS |
Clint A Smith
|
|
|
|
Conference | 5/4/2011 | 5/4/2011 | 5/4/2011 | P | DONE |
Clint A Smith
|
|
|
Spoke with RP and explained that the permit cannot be finaled until the time that all disturbed soil is stabilized or the responsibility of stabilization has been ttransfered in writing to city explaining who is going to be responsible for stsbilizing. Until that time, he is required to provide sediment barriers to keep all sediment from being transported off his site onto the ajacent properties. Will re-inspect on 5/092011AM for a site final.
|
General Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | | PASS |
Steven Webb
|
|
|
Sign posted, barrier in place at street, wall built and backfilled, needs revegetation.
|
General Inspection | 3/17/2011 | 3/17/2011 | 3/17/2011 | | NR |
Clint A Smith
|
|
|
Project still has not begun waiting on BLD activities.
|
General Inspection | 2/14/2011 | 2/14/2011 | 2/14/2011 | | NR |
Clint A Smith
|
|
|
|
General Inspection | 1/13/2011 | 1/13/2011 | 1/13/2011 | | DONE |
Clint A Smith
|
|
|
No activty has occured since permit has been issued.
|
Site Preparation | 12/8/2010 | 12/13/2010 | 12/13/2010 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 12/8/2010 | 12/8/2010 | 12/8/2010 | | NR |
Clint A Smith
|
|
|
Marked out but no activity of excavating.
|
Issue & PRINT permit SFD | | | 12/1/2010 | | DONE |
Barbara Stitt
|
|
|
|
Routing - Erosion and Sediment | 11/22/2010 | | 11/22/2010 | | PASS |
Steven Webb
|
|
|
ESC plan waiver is approved according to the ESC Permit conditions.
|
Application received | | | 11/17/2010 | | |
|
|
|
|