Site Final | 6/3/2011 | 7/7/2011 | 7/7/2011 | A | DONE |
Clint A Smith
|
|
|
Permit finaled.
|
DOC - Permit Finaled | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PASS |
Clint A Smith
|
|
|
|
DOC - Permit Finaled | 7/7/2011 | 7/7/2011 | 7/7/2011 | P | PASS |
Clint A Smith
|
|
|
|
Conference | 6/1/2011 | 6/3/2011 | 6/3/2011 | A | DONE |
Clint A Smith
|
|
|
Applied a seedtach and mulch blend on the disturbed area. Will follow up for a site final on 7/7/2011.
|
General Inspection | 6/1/2011 | 6/1/2011 | 6/1/2011 | | CANC |
Clint A Smith
|
|
|
Moved to a confrence on 6/3/2011am
|
General Inspection | 5/16/2011 | 5/16/2011 | 5/16/2011 | | DONE |
Clint A Smith
|
|
|
No activity. LEft message with RP over the status of the pond expansion.
|
General Inspection | 4/29/2011 | 4/29/2011 | 4/29/2011 | | PASS |
Clint A Smith
|
|
|
No activity on the ponds due to saturated soil.
|
General Inspection | 4/8/2011 | 4/8/2011 | 4/8/2011 | | CANC |
Clint A Smith
|
|
|
|
General Inspection | 3/24/2011 | 3/24/2011 | 3/24/2011 | | PASS |
Clint A Smith
|
|
|
|
General Inspection | 3/9/2011 | 3/9/2011 | 3/10/2011 | | CANC |
Clint A Smith
|
|
|
Have told the RP that no turbid discharges are allowed to the Boise River. If it occurs to stop and contact the City of Boise.
|
General Inspection | 2/22/2011 | 2/22/2011 | 2/22/2011 | | NR |
Clint A Smith
|
|
|
Work has not begun
|
Site Preparation | 1/31/2011 | 2/7/2011 | 2/8/2011 | A | NR |
Clint A Smith
|
|
|
|
Site Preparation | 1/31/2011 | 1/31/2011 | 1/31/2011 | | NR |
Clint A Smith
|
|
|
|
Issue & PRINT permit COM | | | 1/28/2011 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/26/2011 | | PASS |
|
|
|
ESC plan addendum approved per the attached conditions.
|
Application received | | | 12/13/2010 | | |
|
|
|
|